Buku Kas: Kas Pembangunan Masjid
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 13 Juni 2024 | 0,00 | |||
JUMAT | ||||
2024-06-14 | Dede | 200.000,00 | ||
2024-06-14 | Pak Atang | 1.000.000,00 | ||
2024-06-14 | Nur Kholis | 1.000.000,00 | ||
2024-06-14 | Fajar Hidayat | 150.000,00 | ||
2024-06-14 | Budi Karyanto | 100.000,00 | ||
2024-06-14 | Pak Slamet | 150.000,00 | ||
2024-06-14 | Kelompok Tani RK 002 RT 001 | 2.000.000,00 | ||
2024-06-14 | Pak Santo Sutardi (alm) | 1.000.000,00 | ||
2024-06-14 | Hj. Mumbaidah | 5.000.000,00 | ||
2024-06-14 | Bata Bolong (Kas Masjid) 24.000 Bh | 16.200.000,00 | ||
2024-06-14 | Pasir (Mulyono) 11Rit | 9.350.000,00 | ||
2024-06-14 | Pasir 1 rit (Hamba Allah) | 1.100.000,00 | ||
2024-06-14 | Batu Belah (Mulyono) 17 Rit | 27.200.000,00 | ||
2024-06-14 | Semen 15 Zak (Pak Muhtamil) | 825.000,00 | ||
2024-06-14 | Semen 20 Zak (Pak Arbangi) | 1.100.000,00 | ||
2024-06-14 | Bata Bolong (Kas Masjid) 24.000 Bh | 16.200.000,00 | ||
2024-06-14 | Pasir (Mulyono) 11Rit | 9.350.000,00 | ||
2024-06-14 | Pasir 1 rit (Hamba Allah) | 1.100.000,00 | ||
2024-06-14 | Batu Belah (Mulyono) 17 Rit | 27.200.000,00 | ||
2024-06-14 | Semen 15 Zak (Pak Muhtamil) | 825.000,00 | ||
2024-06-14 | Semen 20 Zak (Pak Arbangi) | 1.100.000,00 | ||
Total | 66.375.000,00 | 55.775.000,00 | 10.600.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 14 Juni 2024 | 10.600.000,00 | |||
JUMAT | ||||
2024-06-21 | Beli Kayu Kaso | 300.000,00 | ||
2024-06-21 | Semen 100 Zak (Sutejo) | 5.500.000,00 | ||
2024-06-21 | Semen 10 Zak (Pak Kaspani) | 550.000,00 | ||
2024-06-21 | Semen 10 Zak (Bu Maryam) | 550.000,00 | ||
2024-06-21 | Gerobak Sorong (Hamba Allah) | 450.000,00 | ||
2024-06-21 | Bu Fitri Raple | 150.000,00 | ||
2024-06-21 | Muhamad Rasya | 1.000.000,00 | ||
2024-06-21 | Pak Saleh | 150.000,00 | ||
2024-06-21 | Tono | 120.000,00 | ||
2024-06-21 | Mbh Suraji | 500.000,00 | ||
2024-06-21 | Pak Sarjo | 500.000,00 | ||
2024-06-21 | Bu Lilin | 50.000,00 | ||
2024-06-21 | Mbh H Heru | 3.000.000,00 | ||
2024-06-21 | H Zainal Arifin | 1.000.000,00 | ||
2024-06-21 | Ari Gunawan | 450.000,00 | ||
2024-06-21 | Bang Jul | 500.000,00 | ||
2024-06-21 | Hj Sampun | 1.400.000,00 | ||
2024-06-21 | Semen 100 Zak (Sutejo) | 5.500.000,00 | ||
2024-06-21 | Semen 10 Zak (Pak Kaspani) | 550.000,00 | ||
2024-06-21 | Semen 10 Zak (Bu Maryam) | 550.000,00 | ||
2024-06-21 | Gerobak Sorong (Hamba Allah) | 450.000,00 | ||
AHAD | ||||
2024-06-23 | Biaya Tenaga Pekerja 7 Hari Kerja | 4.160.000,00 | ||
Total | 26.470.000,00 | 11.510.000,00 | 14.960.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 23 Juni 2024 | 14.960.000,00 | |||
JUMAT | ||||
2024-06-28 | Pak Yanto | 500.000,00 | ||
2024-06-28 | Batu Belah 1Rit (Mas April) | 1.500.000,00 | ||
2024-06-28 | Batu Belah 1Rit (BPT) | 1.500.000,00 | ||
2024-06-28 | Batu Belah 1Rit (Mas April) | 1.500.000,00 | ||
2024-06-28 | Batu Belah 1Rit (BPT) | 1.500.000,00 | ||
AHAD | ||||
2024-06-30 | Biaya Tenaga Pekerja 7 Hari Kerja | 1.820.000,00 | ||
Total | 18.460.000,00 | 4.820.000,00 | 13.640.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 30 Juni 2024 | 13.640.000,00 | |||
SELASA | ||||
2024-07-02 | Hamba Allah (rek BSI) | 1.000.000,00 | ||
KAMIS | ||||
2024-07-04 | Infak Jalan 29 Juni - 4 Juli 2024 | 14.280.000,00 | ||
2024-07-04 | Belanja material - 1kubik Batu Split - 50btg Besi 10 mm SNI full - 1roll Bendrat 20kg | 3.820.000,00 | ||
2024-07-04 | Belanja material - Paku 4" - Paku 2" - Gegep Biasa | 215.000,00 | ||
JUMAT | ||||
2024-07-05 | Nia Foto | 200.000,00 | ||
2024-07-05 | Paiman (alm) | 200.000,00 | ||
2024-07-05 | Bpk Prayitno (alm) | 1.000.000,00 | ||
2024-07-05 | Pak Sutino | 280.000,00 | ||
2024-07-05 | Tasmini (alm) | 280.000,00 | ||
2024-07-05 | H Hisbullah Safari | 1.000.000,00 | ||
2024-07-05 | Bpk Suparjo (alm) & Bu Nursiyah Martini (alm) | 500.000,00 | ||
2024-07-05 | Mbk Noti | 250.000,00 | ||
2024-07-05 | Bidan Gita Mulya Kencana | 500.000,00 | ||
2024-07-05 | Pak Mujiana | 400.000,00 | ||
2024-07-05 | Hanin Nazafarin | 1.000.000,00 | ||
2024-07-05 | Bpk Nawirejo | 600.000,00 | ||
2024-07-05 | Hj Mumbaidah | 1.000.000,00 | ||
2024-07-05 | Kotak Infak Toko | 8.911.000,00 | ||
2024-07-05 | Cetak Buku Kerja Gambar Masjid | 200.000,00 | ||
2024-07-05 | Power Ampli + Mic | 1.200.000,00 | ||
2024-07-05 | Biaya Surat Wakaf Tanah Masjid | 200.000,00 | ||
2024-07-05 | Biaya Konsumsi Tim Kemenag | 100.000,00 | ||
2024-07-05 | Kunci Besi | 500.000,00 | ||
2024-07-05 | Pembayaran Bahan Untuk Pembuatan Masjid Sementara | 20.000.000,00 | ||
2024-07-05 | Semen 50 Zak (Pak Siman (alm)) | 2.750.000,00 | ||
2024-07-05 | Semen 50 Zak (Pak Sugi Purwosari) | 2.750.000,00 | ||
2024-07-05 | Semen 22 Zak (Hamba Allah) | 1.210.000,00 | ||
2024-07-05 | Semen 20 Zak (H Subandrio Bandar Jaya) | 1.000.000,00 | ||
2024-07-05 | Besi 16 Ulir 50btg dan Besi 13 Ulir 170btg (H Supardan) | 26.950.000,00 | ||
2024-07-05 | Belanja material - 2pcs Mesin Grinda Doliz - 5pcs Nilon Roll - 25pcs Mata Potong Besi Haston | 670.000,00 | ||
2024-07-05 | Semen 50 Zak (Pak Siman (alm)) | 2.750.000,00 | ||
2024-07-05 | Semen 50 Zak (Pak Sugi Purwosari) | 2.750.000,00 | ||
2024-07-05 | Semen 22 Zak (Hamba Allah) | 1.210.000,00 | ||
2024-07-05 | Semen 20 Zak (H Subandrio Bandar Jaya) | 1.000.000,00 | ||
2024-07-05 | Besi 16 Ulir 50btg dan Besi 13 Ulir 170btg (H Supardan) | 26.950.000,00 | ||
AHAD | ||||
2024-07-07 | Biaya Tenaga Pekerja 7 Hari Kerja | 2.790.000,00 | ||
Total | 79.701.000,00 | 64.355.000,00 | 15.346.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 7 Juli 2024 | 15.346.000,00 | |||
SELASA | ||||
2024-07-09 | Belanja material - 5kg Bendrat | 100.000,00 | ||
RABU | ||||
2024-07-10 | Belanja material - 5pcs Bak Cor Bagus - 5pcs Ember Cor Bagus | 110.000,00 | ||
2024-07-10 | Belanja material - 50btg Besi 13mm Ulir SNI - Batu Split - 1roll Bendrat 20kg | 5.570.000,00 | ||
2024-07-10 | Hamba Allah (rek BSI) | 1.100.000,00 | ||
KAMIS | ||||
2024-07-11 | Infak Jalan 05 Juli - 11 Juli 2024 | 15.008.000,00 | ||
2024-07-11 | Belanja material - 50btg Besi 10mm SNI full | 3.500.000,00 | ||
JUMAT | ||||
2024-07-12 | Hamba Allah | 1.000.000,00 | ||
2024-07-12 | Budi Utomo Bin Suparni | 1.000.000,00 | ||
2024-07-12 | Bu Aisyah (alm) | 500.000,00 | ||
2024-07-12 | Dallail | 1.000.000,00 | ||
2024-07-12 | Hamba Allah | 500.000,00 | ||
2024-07-12 | Bu Sri Umi Bin Muhammad Doni Margo Kencono | 220.000,00 | ||
2024-07-12 | Pak Sarijo | 1.000.000,00 | ||
2024-07-12 | Sewa Alat Berat (exsavator) | 16.000.000,00 | ||
2024-07-12 | Beli Kayu Papan | 4.320.000,00 | ||
2024-07-12 | Pembelian Alat Sefty Pekerja | 800.000,00 | ||
2024-07-12 | Semen 100 Zak (H. Gimun) | 5.000.000,00 | ||
2024-07-12 | Semen 10 Zak (Hamba Allah) | 550.000,00 | ||
2024-07-12 | Semen 10 Zak (Edwin Horden) | 550.000,00 | ||
2024-07-12 | Semen 10 Zak (Bu Srini) | 550.000,00 | ||
2024-07-12 | Semen 20 Zak (Pak Suprat) | 1.100.000,00 | ||
2024-07-12 | Batu split 1rit 6kubik (H. Ahmad ansor (alm)) | 2.300.000,00 | ||
2024-07-12 | Batu split 1rit 6kubik (mbah ichwandi (alm)) | 2.300.000,00 | ||
2024-07-12 | Batu split 1rit 6kubik (H. Mukti Amin (alm)) | 2.300.000,00 | ||
2024-07-12 | pasir 1rit (pak khalwani) | 1.100.000,00 | ||
2024-07-12 | semen 100zak (hamba allah) | 5.500.000,00 | ||
2024-07-12 | semen 35zak (bu leli / H. Samingun) | 1.925.000,00 | ||
2024-07-12 | semen 4zak (bu cicih herawati) | 220.000,00 | ||
2024-07-12 | semen 100zak (Pak Muson) | 5.500.000,00 | ||
2024-07-12 | Beli besi | 300.000,00 | ||
2024-07-12 | Semen 50zak ( H. Gimun) | 2.500.000,00 | ||
2024-07-12 | Semen 20 Zak ( hamba Allah) | 1.000.000,00 | ||
2024-07-12 | Semen 100 Zak ( H. Parno) | 5.500.000,00 | ||
2024-07-12 | Semen 100 Zak ( pak sutejo) | 5.500.000,00 | ||
2024-07-12 | 63 btg besi 16 ulir ( H. Kholil) | 10.000.000,00 | ||
2024-07-12 | Semen 4 Zak (Yudi) | 220.000,00 | ||
2024-07-12 | Semen 10zak (BPT) | 550.000,00 | ||
2024-07-12 | Belanja material - 50btg Besi 13 Ulir SNI | 5.250.000,00 | ||
2024-07-12 | Semen 100 Zak (H. Gimun) | 5.000.000,00 | ||
2024-07-12 | Semen 10 Zak (Hamba Allah) | 550.000,00 | ||
2024-07-12 | Semen 10 Zak (Edwin Horden) | 550.000,00 | ||
2024-07-12 | Semen 10 Zak (Bu Srini) | 550.000,00 | ||
2024-07-12 | Semen 20 Zak (Pak Suprat) | 1.100.000,00 | ||
2024-07-12 | Batu split 1rit 6kubik (H. Ahmad ansor (alm)) | 2.300.000,00 | ||
2024-07-12 | Batu split 1rit 6kubik (mbah ichwandi (alm)) | 2.300.000,00 | ||
2024-07-12 | Batu split 1rit 6kubik (H. Mukti Amin (alm)) | 2.300.000,00 | ||
2024-07-12 | pasir 1rit (pak khalwani) | 1.100.000,00 | ||
2024-07-12 | semen 100zak (hamba allah) | 5.500.000,00 | ||
2024-07-12 | semen 35zak (bu leli / H. Samingun) | 1.925.000,00 | ||
2024-07-12 | semen 4zak (bu cicih herawati) | 220.000,00 | ||
2024-07-12 | semen 100zak (Pak Muson) | 5.500.000,00 | ||
2024-07-12 | Semen 50zak (H. Gimun) | 2.500.000,00 | ||
2024-07-12 | Semen 20 Zak ( hamba Allah) | 1.000.000,00 | ||
2024-07-12 | Semen 100 Zak ( H. Parno) | 5.500.000,00 | ||
2024-07-12 | Semen 100 Zak ( pak sutejo) | 5.500.000,00 | ||
2024-07-12 | 63 btg besi 16 ulir ( H. Kholil) | 10.000.000,00 | ||
2024-07-12 | Semen 4 Zak (Yudi) | 220.000,00 | ||
2024-07-12 | Semen 10 Zak (BPT) | 550.000,00 | ||
2024-07-12 | Konsumsi rapat 11 Juli 2024 | 100.000,00 | ||
AHAD | ||||
2024-07-14 | Pak sukardi | 600.000,00 | ||
2024-07-14 | Biaya Tenaga Pekerja 7 Hari Kerja | 5.610.000,00 | ||
2024-07-14 | Biaya tenaga pekerja 7 hari kerja | 6.860.000,00 | ||
2024-07-14 | 90 btg besi 16mm ulir SNI dan 90 btg besi 13mm ulir SNI (H. Subur) | 23.850.000,00 | ||
2024-07-14 | Semen 7 Zak (Bu Masni) | 385.000,00 | ||
2024-07-14 | Semen 10 Zak ( H. Narto) | 550.000,00 | ||
2024-07-14 | Semen 50 Zak ( Pak Erwan (Toko Baru)) | 2.750.000,00 | ||
2024-07-14 | Semen 100 Zak ( H. Subkhi (Toko Mas Mujur)) | 5.500.000,00 | ||
2024-07-14 | Batu Split 1 m3 (Tb. Makmur) | 1.200.000,00 | ||
2024-07-14 | 90 btg besi 16mm ulir SNI dan 90 btg besi 13mm ulir SNI (H. Subur) | 23.850.000,00 | ||
2024-07-14 | Semen 7 Zak ( Bu Masni) | 385.000,00 | ||
2024-07-14 | Semen 10 Zak ( H. Narto) | 550.000,00 | ||
2024-07-14 | Semen 50 Zak ( Pak Erwan (Toko Baru)) | 2.750.000,00 | ||
2024-07-14 | Semen 100 Zak ( H. Subkhi (Toko Mas Mujur)) | 5.500.000,00 | ||
2024-07-14 | Batu Split 1 m3 (Tb. Makmur) | 1.200.000,00 | ||
Total | 125.674.000,00 | 136.920.000,00 | - 11.246.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 14 Juli 2024 | - 11.246.000,00 | |||
SENIN | ||||
2024-07-15 | Jamaah yasin daya asri Rk2 Rt1&Rt5 | 4.000.000,00 | ||
2024-07-15 | H. Mustofa | 1.000.000,00 | ||
2024-07-15 | Cetak spp warga | 300.000,00 | ||
2024-07-15 | 50 btg Besi 10mm ( Hamba Allah) | 3.500.000,00 | ||
2024-07-15 | 20 btg besi 13mm ulir ( pak Tri) | 2.100.000,00 | ||
2024-07-15 | Batu Split 1 m3 (Tb. Makmur) | 1.200.000,00 | ||
2024-07-15 | 50 btg besi 10mm (Hamba Allah) | 3.500.000,00 | ||
2024-07-15 | 20 btg besi 13mm ulir (pak Tri) | 2.100.000,00 | ||
2024-07-15 | Batu Split 1 m3 (Tb. Makmur) | 1.200.000,00 | ||
2024-07-15 | Belanja material - 1pcs Ban Luar Artco - 1pcs Ban Dalem Artco - 2kg Paku Usuk - 1kg Paku Papan - 1pcs Klaher Artco | 146.000,00 | ||
SELASA | ||||
2024-07-16 | Beli papan cor | 1.000.000,00 | ||
2024-07-16 | Semen 10 Zak ( mas Rudi) | 550.000,00 | ||
2024-07-16 | Semen 10zak (pak Ahmad Sugio) | 550.000,00 | ||
2024-07-16 | Semen 20 Zak (pak suyanto (alm)) | 1.100.000,00 | ||
2024-07-16 | Semen 15 Zak (pak Tahrir) | 825.000,00 | ||
2024-07-16 | Semen 10 Zak (pak Sumardi (alm)) | 550.000,00 | ||
2024-07-16 | Semen 10 Zak (Bu Budi Seniwati) | 550.000,00 | ||
2024-07-16 | Batu Split 1rit 6kubik (Hj. Mumbaedah) | 2.300.000,00 | ||
2024-07-16 | Semen 10 Zak ( Mas Rudi) | 550.000,00 | ||
2024-07-16 | Semen 10zak ( pak Ahmad Sugio) | 550.000,00 | ||
2024-07-16 | Semen 20 Zak (pak suyanto (alm)) | 1.100.000,00 | ||
2024-07-16 | Semen 15 Zak (pak Tahrir) | 825.000,00 | ||
2024-07-16 | Semen 10 Zak (pak Sumardi (alm)) | 550.000,00 | ||
2024-07-16 | Semen 10 Zak (Bu Budi Seniwati) | 550.000,00 | ||
2024-07-16 | Batu Split 1rit 6kubik (Hj. Mumbaedah) | 2.300.000,00 | ||
RABU | ||||
2024-07-17 | Dirman bin Hasanudin | 500.000,00 | ||
2024-07-17 | Hamba Allah | 500.000,00 | ||
2024-07-17 | Hj. Suyati sudadi | 300.000,00 | ||
2024-07-17 | Semen 2 Zak (Hamba Allah) | 110.000,00 | ||
2024-07-17 | Semen 4 Zak (Hamba Allah) | 220.000,00 | ||
2024-07-17 | Semen 10 Zak (Kurnia Wirajaya) | 550.000,00 | ||
2024-07-17 | Batu Split 1rit 6kubik (Nurkholis) | 2.300.000,00 | ||
2024-07-17 | Semen 2 Zak (Hamba Allah) | 110.000,00 | ||
2024-07-17 | Semen 4 Zak (Hamba Allah) | 220.000,00 | ||
2024-07-17 | Semen 10 Zak (Kurnia Wirajaya) | 550.000,00 | ||
2024-07-17 | Batu Split 1rit 6kubik (Nurkholis) | 2.300.000,00 | ||
2024-07-17 | Belanja material - 1kg Paku Reng Kayu - 1pcs Mata Bor Kayu Haston | 52.000,00 | ||
KAMIS | ||||
2024-07-18 | Infak jalan 12 Juli 2024 - 18 Juli 2024 | 17.583.000,00 | ||
2024-07-18 | Pembayaran bahan bangunan untuk masjid sementara | 17.843.000,00 | ||
2024-07-18 | Beli pasir 1rit | 1.100.000,00 | ||
2024-07-18 | Batu Split 1rit 6kubik (Nurkholis) | 2.300.000,00 | ||
2024-07-18 | Belanja material - 30btg PVC 3" Rucika AW - 2pcs knie 3" R D | 5.740.000,00 | ||
2024-07-18 | Batu Split 1rit 6kubik (Nurkholis) | 2.300.000,00 | ||
JUMAT | ||||
2024-07-19 | Infak jalan tgl 19-7-2024 | 3.420.000,00 | ||
2024-07-19 | Pak Guntoro bin Riyadi | 1.000.000,00 | ||
2024-07-19 | Pak Alif fiantoro | 1.000.000,00 | ||
2024-07-19 | Pak Sukirman (alm) bin Ahmad Sarfudin | 5.000.000,00 | ||
2024-07-19 | Beli pasir 1 rit | 1.100.000,00 | ||
SABTU | ||||
2024-07-20 | Pembayaran pekerja galian pondasi manual 4 lobang | 660.000,00 | ||
2024-07-20 | Hamba Allah | 2.000.000,00 | ||
2024-07-20 | Hamba Allah | 5.000.000,00 | ||
2024-07-20 | H. Sumardi | 2.000.000,00 | ||
2024-07-20 | H. Asludin | 500.000,00 | ||
2024-07-20 | Infak jalan tgl 20-7-2024 | 1.110.000,00 | ||
2024-07-20 | Semen 2 zak (Dzaky Asyrafil Hanif | 110.000,00 | ||
2024-07-20 | Semen 2 zak (Dzaky Asyrafil Hanif | 110.000,00 | ||
AHAD | ||||
2024-07-21 | Infak jalan tgl 21-7-2024 | 1.710.000,00 | ||
2024-07-21 | Yudi Bakso Sastro | 1.000.000,00 | ||
2024-07-21 | H. Sutrisno, Daya Sakti (rek BSI) | 1.000.000,00 | ||
2024-07-21 | Biaya tenaga pekerja 7 hari kerja | 7.410.000,00 | ||
2024-07-21 | Semen 20 zak (Hamba Allah) | 1.100.000,00 | ||
2024-07-21 | Semen 20 zak (Hamba Allah) | 1.100.000,00 | ||
Total | 57.292.000,00 | 55.266.000,00 | 2.026.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 21 Juli 2024 | 2.026.000,00 | |||
SENIN | ||||
2024-07-22 | Infak jalan tgl 22-7-2024 | 2.200.000,00 | ||
2024-07-22 | Beli pasir 1 rit | 1.100.000,00 | ||
2024-07-22 | Infak SPP warga Rk. 02, Rt. 06 | 425.000,00 | ||
2024-07-22 | Infak SPP warga Rk. 02, Rt. 01 | 445.000,00 | ||
2024-07-22 | Infak SPP warga Rk. 02, Rt. 02 | 375.000,00 | ||
SELASA | ||||
2024-07-23 | Infak jalan tgl 23-7-2024 | 1.710.000,00 | ||
2024-07-23 | PERI | 100.000,00 | ||
2024-07-23 | Mas Yanto | 50.000,00 | ||
2024-07-23 | Mas Hasim atau mbak Ambar, Murni Jaya | 300.000,00 | ||
2024-07-23 | Pak Thomas Chaniago | 200.000,00 | ||
2024-07-23 | Yadi | 200.000,00 | ||
2024-07-23 | Pak Tarmijo, Dayamunrni | 1.000.000,00 | ||
2024-07-23 | H. Slomon | 300.000,00 | ||
2024-07-23 | Beli 1 rit pasir | 1.100.000,00 | ||
2024-07-23 | Semen 10 zak (Pak Suhatri) | 550.000,00 | ||
2024-07-23 | Semen 10 zak ( Bu Arnis) | 550.000,00 | ||
2024-07-23 | Semen 20 Zak (H Muh) | 1.100.000,00 | ||
2024-07-23 | Semen 10 zak ( pak suhatri) | 550.000,00 | ||
2024-07-23 | Semen 10 zak ( Bu Arnis) | 550.000,00 | ||
2024-07-23 | Semen 20 Zak (H Muh) | 1.100.000,00 | ||
RABU | ||||
2024-07-24 | Infak Jalan tgl 24-7-2024 | 1.420.000,00 | ||
2024-07-24 | Kotak Infak Toko Mas Mif | 495.000,00 | ||
2024-07-24 | Beli Kawat Las | 300.000,00 | ||
2024-07-24 | Pasir 1 Rit (Budi Bengkel) | 1.100.000,00 | ||
2024-07-24 | Belanja material - 4pcs Cetok Sliper 7" 4bh | 120.000,00 | ||
2024-07-24 | Belanja material - 1roll Praba 2x2,5 50m - 2pcs Kaca Mata Las Haston - 2pcs Stop l2 broco - 2pcs Colokan Broco - 1ktk enka 2.0 1kg | 880.000,00 | ||
2024-07-24 | Belanja material - 3pcs Bak Cor Bagus | 45.000,00 | ||
2024-07-24 | Pasir 1 Rit (Budi Bengkel) | 1.100.000,00 | ||
KAMIS | ||||
2024-07-25 | H. Muhroni | 1.500.000,00 | ||
2024-07-25 | Mas Yanto pecel lele | 1.000.000,00 | ||
2024-07-25 | Pak Boimin alm | 400.000,00 | ||
2024-07-25 | Pak Tukino alm | 1.500.000,00 | ||
2024-07-25 | mas bayu | 500.000,00 | ||
2024-07-25 | Infak Jalan tgl 25-7-2024 | 1.580.000,00 | ||
JUMAT | ||||
2024-07-26 | Semen 10 zak (Pak Sunaryo) | 560.000,00 | ||
2024-07-26 | Besi 16mm Ulir SNI 50btg (H. Muhammad (Bakso Punokawan)) | 8.000.000,00 | ||
2024-07-26 | Semen 50zak (Mas Dedy (Cahaya Monas)) | 2.750.000,00 | ||
2024-07-26 | Batu belah 1 rit ( Yuda Bengkel Motor) | 1.700.000,00 | ||
2024-07-26 | 1 rit pasir (Pak Cemet) Mulya asri | 1.100.000,00 | ||
2024-07-26 | Semen 2 zak (mbk Insyi Nur'aini) | 110.000,00 | ||
2024-07-26 | Semen 10 zak (Pak Sunaryo) | 560.000,00 | ||
2024-07-26 | Besi 16mm Ulir SNI 50btg ( H. Muhammad (Bakso Punokawan)) | 8.000.000,00 | ||
2024-07-26 | Semen 50zak (Mas Dedy (Cahaya Monas)) | 2.750.000,00 | ||
2024-07-26 | Batu belah 1 rit ( Yuda Bengkel Motor) | 1.700.000,00 | ||
2024-07-26 | Belanja material 100 btg besi 10mm full SNI | 6.900.000,00 | ||
2024-07-26 | Belanja material 1 ktk kawat las RB 2,6 | 175.000,00 | ||
2024-07-26 | 1 rit pasir (Pak Cemet) Mulya asri | 1.100.000,00 | ||
2024-07-26 | Semen 2 zak (mbk Insyi Nur'aini) | 110.000,00 | ||
2024-07-26 | Pak Basmara | 1.000.000,00 | ||
2024-07-26 | Rohmadi (foto copy Jibril) (rek BSI) | 1.000.000,00 | ||
2024-07-26 | Opa Suparya (Dayamurni) | 500.000,00 | ||
2024-07-26 | H. Rahmadi (Foto copy Nusantara) | 500.000,00 | ||
2024-07-26 | Pak Imam S. (Toko MM) Pulung kencana | 5.000.000,00 | ||
2024-07-26 | Ayu ningtyas Larasati (rek BSI) | 50.000,00 | ||
2024-07-26 | Infak jalan tgl 26-7-2024 | 2.580.000,00 | ||
SABTU | ||||
2024-07-27 | Infak jalan tgl 27-7-2024 | 1.265.000,00 | ||
2024-07-27 | Semen 100zak (H. Susilo) | 5.500.000,00 | ||
2024-07-27 | Semen 222 zak ( Hj. Ina (keripik ALAMI)) Murni jaya | 12.210.000,00 | ||
2024-07-27 | 35 btg besi 16mm Ulir SNI ( Mirwan Purnomo) | 5.600.000,00 | ||
2024-07-27 | 15 btg besi 16mm Ulir (Hj. Mumbaedah) | 2.400.000,00 | ||
2024-07-27 | Semen 100zak (H. Susilo) | 5.500.000,00 | ||
2024-07-27 | Semen 222 zak ( Hj. Ina (keripik ALAMI)) Murni jaya | 12.210.000,00 | ||
2024-07-27 | 35 btg besi 16mm Ulir ( Mirwan Purnomo) | 5.600.000,00 | ||
2024-07-27 | 15 btg besi 16mm Ulir (Hj. Mumbaedah) | 2.400.000,00 | ||
AHAD | ||||
2024-07-28 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
2024-07-28 | 35btg besi 16mm Ulir ( RM Alvian Rasa) | 5.600.000,00 | ||
2024-07-28 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
2024-07-28 | 35btg besi 16mm Ulir ( RM Alvian Rasa) | 5.600.000,00 | ||
2024-07-28 | Belanja material 2ktk kawat las RB 2,6 | 350.000,00 | ||
2024-07-28 | Infak jalan tgl 28-7-2024 | 1.135.000,00 | ||
2024-07-28 | H. Habibi | 1.000.000,00 | ||
2024-07-28 | PMTB | 620.000,00 | ||
2024-07-28 | Biaya tenaga pekerja 7hari kerja | 8.685.000,00 | ||
2024-07-28 | Biaya lembur malam tenaga gotong royong | 225.000,00 | ||
Total | 81.756.000,00 | 69.260.000,00 | 12.496.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 28 Juli 2024 | 12.496.000,00 | |||
SENIN | ||||
2024-07-29 | H. Sukardi (Daya sakti) | 500.000,00 | ||
2024-07-29 | Infak jalan tgl 29-7-2024 | 1.300.000,00 | ||
2024-07-29 | Biaya serkel papan cor 4cm kayu randu | 920.000,00 | ||
2024-07-29 | Belanja material 100btg besi 10mm full SNI | 6.900.000,00 | ||
2024-07-29 | Belanja material 150btg besi 13mm Ulir SNI | 15.000.000,00 | ||
2024-07-29 | Besi 16mm Ulir SNI 12btg (Hj. Mumbaedah) | 1.920.000,00 | ||
2024-07-29 | 3rit pasir (Pak mulyono) | 2.550.000,00 | ||
2024-07-29 | 2rit Batu belah (pak mulyono) | 3.400.000,00 | ||
2024-07-29 | Besi 16mm Ulir SNI 12btg (Hj. Mumbaedah) | 1.920.000,00 | ||
2024-07-29 | 3rit pasir (Pak mulyono) | 2.550.000,00 | ||
2024-07-29 | 2rit Batu belah (pak mulyono) | 3.400.000,00 | ||
SELASA | ||||
2024-07-30 | Infak jalan tgl 30-7-2024 | 1.320.000,00 | ||
2024-07-30 | Yulistaryani (rek BSI) | 1.000.000,00 | ||
2024-07-30 | Beli material 150btg besi 13mm ulir SNI | 15.000.000,00 | ||
2024-07-30 | Belanja material 25pcs mata potong gerinda besi | 90.000,00 | ||
RABU | ||||
2024-07-31 | Infak jalan tgl 31-7-2024 | 1.100.000,00 | ||
2024-07-31 | Belanja material 2roll kawat bendrat | 640.000,00 | ||
2024-07-31 | Beli pasir 1rit | 1.100.000,00 | ||
2024-07-31 | Semen 10zak (Bu Fatimah (alm) binti Nur ngalim) | 550.000,00 | ||
2024-07-31 | Pasir 1 rit (Pak Matni) | 1.100.000,00 | ||
2024-07-31 | Semen 10zak (Bu Fatimah (alm) binti Nur ngalim) | 550.000,00 | ||
2024-07-31 | Pasir 1 rit (Pak Matni) | 1.100.000,00 | ||
2024-07-31 | Infak SPP warga Rk. 02, Rt. 01 | 760.000,00 | ||
2024-07-31 | Infak SPP warga Rk. 02, Rt. 07 | 725.000,00 | ||
2024-07-31 | Infak SPP warga Rk. 02, Rt. 04 | 830.000,00 | ||
KAMIS | ||||
2024-08-01 | Infak jalan tgl 1-8-2024 | 1.260.000,00 | ||
JUMAT | ||||
2024-08-02 | Infak jalan tgl 2-8-2024 | 2.440.000,00 | ||
2024-08-02 | Infak amplop pasar dayamurni 2-8-2024 | 615.000,00 | ||
2024-08-02 | Dedi | 500.000,00 | ||
2024-08-02 | H. Taslim (alm) dan Hj. Lami (alm) H. Djajuli (alm) dan Hj. Misiyah (alm) | 3.000.000,00 | ||
2024-08-02 | Semen 2 zak ( Dzaky Asyrafil Hanif) | 110.000,00 | ||
2024-08-02 | Pasir 1 rit (Pedagang emas&perak pulung kencana) | 1.100.000,00 | ||
2024-08-02 | Besi 10mm 100btg dan besi 16mm ulir 20btg (Pak Anto pupuk) | 10.000.000,00 | ||
2024-08-02 | Semen 2 zak ( Dzaky Asyrafil Hanif) | 110.000,00 | ||
2024-08-02 | Pasir 1 rit (Pedagang emas&perak pulung kencana) | 1.100.000,00 | ||
2024-08-02 | Besi 10mm 100btg dan besi 16mm ulir 20btg (Pak Anto pupuk) | 10.000.000,00 | ||
SABTU | ||||
2024-08-03 | Infak jalan tgl 3-8-2024 | 1.850.000,00 | ||
2024-08-03 | Belanja material 5kg paku | 85.000,00 | ||
2024-08-03 | Belanja material 2roll kawat bendrat @20kg | 640.000,00 | ||
2024-08-03 | Belanja material 1btg pipa besi 1" Medium tebel (Tiang bendera) | 120.000,00 | ||
AHAD | ||||
2024-08-04 | Infak jalan tgl 4-8-2024 | 1.750.000,00 | ||
2024-08-04 | Biaya tenaga pekerja 7 hari kerja + lembur | 8.805.000,00 | ||
2024-08-04 | Batu split 2rit (12 kubik) ( H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-08-04 | Batu split 2rit (12kubik) ( H. Ahmad ansor (alm)) | 4.600.000,00 | ||
Total | 56.776.000,00 | 74.630.000,00 | - 17.854.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 4 Agustus 2024 | - 17.854.000,00 | |||
SENIN | ||||
2024-08-05 | Raysa Mart (Toko Pakaian Daya asri) | 1.000.000,00 | ||
2024-08-05 | ABD. Rahman Saleh (alm) bin Marfuin | 1.500.000,00 | ||
2024-08-05 | Bank MANDIRI (Daya asri) | 2.300.000,00 | ||
2024-08-05 | H. Idris (Daya murni) | 500.000,00 | ||
2024-08-05 | Bu Hari Supriyati (alm) | 500.000,00 | ||
2024-08-05 | Bu Sudarmiyati (alm) | 500.000,00 | ||
2024-08-05 | Budi ambal | 500.000,00 | ||
2024-08-05 | Pak Karbiso | 300.000,00 | ||
2024-08-05 | Pak Suparmo (Dayamurni) | 100.000,00 | ||
2024-08-05 | Infak jalan tgl 5-8-2024 | 1.220.000,00 | ||
2024-08-05 | Sewa Alat berat | 2.500.000,00 | ||
2024-08-05 | Beli papan spanel (4x25x400) 49k dan Kaso (2x25) | 4.250.000,00 | ||
2024-08-05 | Biaya serkel pohon randu 3,6 kubik | 2.200.000,00 | ||
2024-08-05 | Semen 5 zak (Hamba Allah) | 255.000,00 | ||
2024-08-05 | Semen 10zak (Pak Rosikin) | 510.000,00 | ||
2024-08-05 | Belanja material - 3kg paku - 1roll tambang 2mm | 71.000,00 | ||
2024-08-05 | Belanja material 6 gulung kawat seng/ kawat anten | 150.000,00 | ||
2024-08-05 | Belanja material 1dus Paku 3" | 300.000,00 | ||
2024-08-05 | Semen 5 zak (Hamba Allah) | 255.000,00 | ||
2024-08-05 | Semen 10zak (Pak Rosikin) | 510.000,00 | ||
SELASA | ||||
2024-08-06 | Batu split 6kubik (H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
2024-08-06 | Batu split 6kubik (H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
2024-08-06 | Belanja Material 3ktk paku beton DAIWA 2" | 90.000,00 | ||
2024-08-06 | Belanja Material 1ktk paku beton DAIWA 4" | 40.000,00 | ||
2024-08-06 | Infak jalan tgl 6-8-2024 | 1.190.000,00 | ||
2024-08-06 | Bu Hj. Suwarsih (alm) | 500.000,00 | ||
2024-08-06 | H. Warno (Dayamurni) | 350.000,00 | ||
2024-08-06 | Mas Cecep (BAWASLU) (rek BSI) | 1.500.000,00 | ||
2024-08-06 | Haryo Sulistyo dan Dwi Asih Susanti (rek BSI) | 1.000.000,00 | ||
RABU | ||||
2024-08-07 | Infak jalan tgl 7-8-2024 | 1.080.000,00 | ||
2024-08-07 | Bu Dwi Permata Sari (rek BSI) | 10.000.000,00 | ||
2024-08-07 | Belanja material 20bj ember cor orange bagus | 140.000,00 | ||
2024-08-07 | Konsumsi Rapat evaluasi 7-8-2024 | 100.000,00 | ||
KAMIS | ||||
2024-08-08 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
2024-08-08 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
2024-08-08 | Belanja material 6 gulung kawat seng besar | 150.000,00 | ||
2024-08-08 | Belanja material 2pcs Gerobak sorong ARTCO | 1.250.000,00 | ||
2024-08-08 | Bpk Tabrani Achmad Bangsawan (wakaf Hj. Maryana Bulhasan SAg) | 5.000.000,00 | ||
2024-08-08 | Infak jalan tgl 8-8-2024 | 1.760.000,00 | ||
JUMAT | ||||
2024-08-09 | Semen 5zak (Hamba Allah) | 255.000,00 | ||
2024-08-09 | Semen 2zak (Bu Entin Wartinah (alm)) | 110.000,00 | ||
2024-08-09 | Semen 5zak (Hamba Allah) | 255.000,00 | ||
2024-08-09 | Semen 2zak (Bu Entin Wartinah (alm)) | 110.000,00 | ||
2024-08-09 | Pak Ahmad Yuliana S. Ag (Margo Mulyo) (rek BSI) | 1.000.000,00 | ||
2024-08-09 | Ky. Radiman | 1.000.000,00 | ||
2024-08-09 | Eko Dwi Saputro | 200.000,00 | ||
2024-08-09 | Miswanto | 500.000,00 | ||
2024-08-09 | Asrofi | 50.000,00 | ||
2024-08-09 | Tugiono | 100.000,00 | ||
2024-08-09 | Riadi | 200.000,00 | ||
2024-08-09 | Pak Nurhamid | 100.000,00 | ||
2024-08-09 | Dimas | 200.000,00 | ||
2024-08-09 | Bisri | 100.000,00 | ||
2024-08-09 | M. Toha | 1.000.000,00 | ||
2024-08-09 | Pak Dalail | 100.000,00 | ||
2024-08-09 | Hamba Allah | 100.000,00 | ||
2024-08-09 | Infak jalan tgl 9-8-2024 | 1.980.000,00 | ||
2024-08-09 | Infak amplop pasar dayamurni 9-8-2024 | 830.000,00 | ||
SABTU | ||||
2024-08-10 | Infak jalan tgl 10-8-2024 | 1.300.000,00 | ||
2024-08-10 | Pak Juanda Naim (Jakarta) (rek BSI) | 3.000.000,00 | ||
2024-08-10 | Bu Nurul Laili Hidayati (alm) Binti Subandi | 1.000.000,00 | ||
2024-08-10 | Pak Mad Sholihin Bin Sholehan | 800.000,00 | ||
2024-08-10 | Odin semangka (Margo Dadi) | 500.000,00 | ||
2024-08-10 | H. Yunus (Margo Dadi) | 1.000.000,00 | ||
2024-08-10 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
2024-08-10 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
AHAD | ||||
2024-08-11 | Semen 2zak (Bu ARIFIN) | 116.000,00 | ||
2024-08-11 | Semen 2zak (Bu ARIFIN) | 116.000,00 | ||
2024-08-11 | Biaya borongan Galian Tanah cakar lengkung pintu 2 sisi | 300.000,00 | ||
2024-08-11 | Belanja material 1ktk paku beton DAIWA 2,5" 2klg cat pylox | 80.000,00 | ||
2024-08-11 | Belanja material 1dus paku 4" | 300.000,00 | ||
2024-08-11 | Biaya Tenaga pekerja 7 hari kerja | 7.800.000,00 | ||
2024-08-11 | Infak jalan tgl 11-8-2024 | 2.060.000,00 | ||
Total | 34.712.000,00 | 24.367.000,00 | 10.345.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 11 Agustus 2024 | 10.345.000,00 | |||
SENIN | ||||
2024-08-12 | Infak jalan tgl 12-8-2024 | 1.460.000,00 | ||
2024-08-12 | Belanja material 2roll kawat bendrat 1bh kikir gergaji Bahco | 675.000,00 | ||
2024-08-12 | Pasir 2rit (Pak Yatno Makarti) | 2.200.000,00 | ||
2024-08-12 | Kayu kaso sengon campur -+1,5kubik (Pak Pramono ,Dayamurni) | 1.500.000,00 | ||
2024-08-12 | Pasir 2rit (Pak Yatno Makarti) | 2.200.000,00 | ||
2024-08-12 | Kayu kaso sengon campur -+1,5kubik (Pak Pramono ,Dayamurni) | 1.500.000,00 | ||
SELASA | ||||
2024-08-13 | Infak jalan tgl 13-8-2024 | 1.155.000,00 | ||
2024-08-13 | Pak Nursidik (Toko Pupuk Dayamurni) | 1.000.000,00 | ||
2024-08-13 | H. Mustofa (Daya asri) | 1.000.000,00 | ||
2024-08-13 | Belanja material 100btg besi 10mm Full SNI 25pcs Mata potong besi Haston | 6.990.000,00 | ||
2024-08-13 | Batu split 2rit (H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-08-13 | Batu split 2rit (H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
RABU | ||||
2024-08-14 | Infak jalan tgl 14-8-2024 | 910.000,00 | ||
2024-08-14 | H. Purwanto (marga kencana) | 5.000.000,00 | ||
2024-08-14 | H. Sugiri (Murni jaya) | 2.000.000,00 | ||
2024-08-14 | Pak Sukino (Murni Jaya) | 200.000,00 | ||
2024-08-14 | H. Maulana (Gading kencana) | 500.000,00 | ||
2024-08-14 | H. Rasit (Gading kencana) | 200.000,00 | ||
2024-08-14 | Pramono | 165.000,00 | ||
2024-08-14 | Amat | 50.000,00 | ||
2024-08-14 | T. Naharudin | 200.000,00 | ||
2024-08-14 | Erik | 100.000,00 | ||
2024-08-14 | Infak SPP warga Rk. 02 , Rt. 05 | 960.000,00 | ||
2024-08-14 | Infak SPP warga Rk. 02, Rt. 01 | 1.000.000,00 | ||
2024-08-14 | Infak SPP warga Rk. 02, Rt. 03 | 1.400.000,00 | ||
2024-08-14 | Infak SPP warga Rk. 02, Rt. 06 | 270.000,00 | ||
2024-08-14 | Infak SPP warga Rk. 02, Rt. 02 | 200.000,00 | ||
2024-08-14 | Belanja Material 1dus Paku 4" | 300.000,00 | ||
2024-08-14 | Semen merah putih 20zak (Pak Fitri Yanto) | 1.020.000,00 | ||
2024-08-14 | Konsumsi Tukang serkel | 338.000,00 | ||
2024-08-14 | Semen merah putih 20zak (Pak Fitri Yanto) | 1.020.000,00 | ||
KAMIS | ||||
2024-08-15 | Infak jalan tgl 15-8-2024 | 1.110.000,00 | ||
2024-08-15 | Bu Sumiyati (rek BSI) | 550.000,00 | ||
2024-08-15 | Belanja material 20btg PVC 3" Rucika AW | 3.800.000,00 | ||
JUMAT | ||||
2024-08-16 | Infak jalan tgl 16-8-2024 | 1.695.000,00 | ||
2024-08-16 | Infak amplop pasar dayamurni 16-8-2024 | 315.000,00 | ||
2024-08-16 | H. Zein | 1.500.000,00 | ||
2024-08-16 | Pak Romadhon PPL (lampung utara) (rek BSI) | 1.000.000,00 | ||
2024-08-16 | Infak pengajian diBalai tiyuh Daya Asri, memperingati Hari kemerdekaan ke79 | 1.778.000,00 | ||
2024-08-16 | Beli pasir 1 rit | 1.100.000,00 | ||
2024-08-16 | Batu split 1rit (H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
2024-08-16 | Batu split 1rit (H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
SABTU | ||||
2024-08-17 | Beli pasir 1rit | 1.100.000,00 | ||
2024-08-17 | Semen 2 zak (Pak Nasuha (alm)) | 110.000,00 | ||
2024-08-17 | Semen 2 zak (Pak Nasuha (alm)) | 110.000,00 | ||
AHAD | ||||
2024-08-18 | Infak jalan tgl 18-8-2024 | 1.075.000,00 | ||
2024-08-18 | Biaya tenaga pekerja 7 hari kerja | 6.795.000,00 | ||
2024-08-18 | Biaya serkel kayu usuk 4,5kubik | 2.650.000,00 | ||
2024-08-18 | Belanja material 1dus paku 3" | 300.000,00 | ||
2024-08-18 | Tukang serkel | 200.000,00 | ||
Total | 49.068.000,00 | 35.778.000,00 | 13.290.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 18 Agustus 2024 | 13.290.000,00 | |||
SENIN | ||||
2024-08-19 | Infak jalan tgl 19-8-2024 | 850.000,00 | ||
2024-08-19 | Pak Dayat | 4.000.000,00 | ||
2024-08-19 | Prasetyo | 500.000,00 | ||
2024-08-19 | Sumardi (rek Bank Lampung) | 500.000,00 | ||
2024-08-19 | Jual besi bekas | 1.600.000,00 | ||
2024-08-19 | Belanja material 2roll kawat bendrat | 640.000,00 | ||
2024-08-19 | Semen 50zak (Bu Sulimah (alm)) | 2.750.000,00 | ||
2024-08-19 | Semen 50zak (Bu Sulimah (alm)) | 2.750.000,00 | ||
SELASA | ||||
2024-08-20 | Infak jalan tgl 20-8-2024 | 1.625.000,00 | ||
2024-08-20 | Belanja material 50btg besi 10mm Full KSTY 50btg besi 10mm TJS | 6.900.000,00 | ||
RABU | ||||
2024-08-21 | Infak jalan tgl 21-8-2024 | 830.000,00 | ||
2024-08-21 | Belanja material 25pcs mata potong besi gerinda Haston | 90.000,00 | ||
KAMIS | ||||
2024-08-22 | Infak jalan tgl 22-8-2024 | 1.100.000,00 | ||
2024-08-22 | Biaya serkel kayu usuk -+4,6kubik | 2.800.000,00 | ||
2024-08-22 | Belanja material 1dus paku 4" | 300.000,00 | ||
2024-08-22 | Konsumsi tukang serkel | 580.000,00 | ||
2024-08-22 | Hamba Allah (rek BSI) | 500.000,00 | ||
JUMAT | ||||
2024-08-23 | Infak jalan Tgl 23-8-2024 | 1.400.000,00 | ||
2024-08-23 | Bu Dimi (alm) binti Sariman (alm) | 5.500.000,00 | ||
2024-08-23 | Hamba Allah | 400.000,00 | ||
2024-08-23 | Hamba Allah | 400.000,00 | ||
2024-08-23 | Hamba Allah (Rek BSI) | 20.000,00 | ||
2024-08-23 | Infak amplop pasar dayamurni 23-8-2024 | 370.000,00 | ||
2024-08-23 | Belanja material 2roll kawat bendrat | 640.000,00 | ||
2024-08-23 | Belanja material 100btg besi 10mm TJS | 5.900.000,00 | ||
2024-08-23 | Belanja material 2ktk paku beton Daiwa 2" | 50.000,00 | ||
SABTU | ||||
2024-08-24 | Infak jalan tgl 24-8-2024 | 1.560.000,00 | ||
2024-08-24 | Belanja material 1dus paku 4" 3pcs pacul Boyo 3pcs gagang pacul 1pcs Lot Batu 500gr | 505.000,00 | ||
AHAD | ||||
2024-08-25 | Infak jalan tgl 25-8-2025 | 1.245.000,00 | ||
2024-08-25 | Biaya tenaga pekerja 7 hari kerja | 7.990.000,00 | ||
Total | 38.440.000,00 | 29.145.000,00 | 9.295.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 25 Agustus 2024 | 9.295.000,00 | |||
SENIN | ||||
2024-08-26 | Infak jalan tgl 26-8-2024 | 1.950.000,00 | ||
2024-08-26 | Elang Mas (Bandar Lampung) | 500.000,00 | ||
2024-08-26 | H. Ahmad (Bandar Lampung) | 200.000,00 | ||
SELASA | ||||
2024-08-27 | Infak jalan tgl 27-8-2024 | 1.050.000,00 | ||
2024-08-27 | Pak Agus Polisi | 1.500.000,00 | ||
2024-08-27 | Mandala Finance | 300.000,00 | ||
2024-08-27 | H. Tarjono (Dayamurni) | 500.000,00 | ||
2024-08-27 | Pak Bambang sukardi (Showroom Motor) | 500.000,00 | ||
2024-08-27 | Bu Solehah (Daya sakti) | 3.000.000,00 | ||
2024-08-27 | Pak Iswahyudi / Dr. Wita (Marga Kencana) | 2.000.000,00 | ||
2024-08-27 | Hj. Murwati | 500.000,00 | ||
2024-08-27 | Pak Ichan (Showroom motor) | 500.000,00 | ||
2024-08-27 | Hj. Sampun | 2.500.000,00 | ||
2024-08-27 | H. Dalari (alm) | 2.500.000,00 | ||
2024-08-27 | Gufron setiawan (rek BSI) | 300.000,00 | ||
2024-08-27 | Biaya sewa excavator pak mul dan sewa mobil 4hari dari tgl 23-8-2024 s/d 26-8-2024, ditanah Pak pur (208rit) (TAHAP 1) | 20.800.000,00 | ||
2024-08-27 | Biaya sewa excavator pak mul dimasjid Alfatah selama 4hari, untuk menimbun puing2 bangunan lama | 7.000.000,00 | ||
2024-08-27 | Semen 25zak ( Mas April) | 1.375.000,00 | ||
2024-08-27 | Semen 5zak (Bu Masni Dongaran) | 275.000,00 | ||
2024-08-27 | Semen 5zak ( Pak Ahmad Idris Tanjung) | 275.000,00 | ||
2024-08-27 | Semen 11zak (Hamba Allah) | 616.000,00 | ||
2024-08-27 | Semen 5zak (Pak Matni) | 255.000,00 | ||
2024-08-27 | Konsumsi tukang serkel susulan 1 | 200.000,00 | ||
2024-08-27 | Semen 25zak ( Mas April) | 1.375.000,00 | ||
2024-08-27 | Semen 5zak (Bu Masni Dongaran) | 275.000,00 | ||
2024-08-27 | Semen 5zak ( Pak Ahmad Idris Tanjung) | 275.000,00 | ||
2024-08-27 | Semen 11zak (Hamba Allah) | 616.000,00 | ||
2024-08-27 | Semen 5zak (Pak Matni) | 255.000,00 | ||
RABU | ||||
2024-08-28 | Infak jalan tgl 28-8-2024 | 1.010.000,00 | ||
2024-08-28 | Konsumsi Gotong royong 28-8-2024 | 250.000,00 | ||
KAMIS | ||||
2024-08-29 | Infak jalan tgl 29-8-2024 | 1.094.000,00 | ||
2024-08-29 | Infak pasar Pulung kencana 29-8-2024 | 475.000,00 | ||
2024-08-29 | Iwan setiawan (karta raharja) (rek Bank Lampung) | 500.000,00 | ||
2024-08-29 | Biaya sewa excavator pak mul dan sewa mobil 2hari tgl 27-8-2024 s/d 28-8-2024 , ditanah pak pur (100rit) (Tahap 2) | 10.000.000,00 | ||
2024-08-29 | Beli solar molen | 50.000,00 | ||
2024-08-29 | Semen 2zak (Bu arifin) | 116.000,00 | ||
2024-08-29 | Belanja material 4pcs kerekan timba | 160.000,00 | ||
2024-08-29 | Belanja material 1pcs ban luar Artis 1pcs ban dalam Artco | 80.000,00 | ||
2024-08-29 | Semen 2zak (Bu arifin) | 116.000,00 | ||
JUMAT | ||||
2024-08-30 | Infak jalan tgl 30-8-2024 | 1.585.000,00 | ||
2024-08-30 | Infak amplop pasar dayamurni, jumat 30-8-2024 | 1.200.000,00 | ||
2024-08-30 | Saprudin (alm) bin Asirin dan Hadijah (alm) binti Ahdi | 800.000,00 | ||
2024-08-30 | Semen 2 zak (Bu cicih herawati) | 110.000,00 | ||
2024-08-30 | Semen 50 zak (Dedi Cahaya Monas) | 2.750.000,00 | ||
2024-08-30 | Semen 2 zak (Bu Cicih herawati) | 110.000,00 | ||
2024-08-30 | Semen 50 zak (Dedi Cahaya Monas) | 2.750.000,00 | ||
SABTU | ||||
2024-08-31 | Infak jalan tgl 31-8-2024 | 540.000,00 | ||
2024-08-31 | Infak SPP warga Rk. 02 , Rt. 03 | 1.255.000,00 | ||
2024-08-31 | Infak SPP warga Rk. 02, Rt. 01 | 903.000,00 | ||
2024-08-31 | Infak SPP warga Rk. 02, Rt. 07 | 850.000,00 | ||
2024-08-31 | Semen 20 zak (Mbak Mung) | 1.100.000,00 | ||
2024-08-31 | Semen 27 zak ( H. Darmanto (Bakul Swalayan)) | 1.485.000,00 | ||
2024-08-31 | Semen 10 zak ( Dila) | 550.000,00 | ||
2024-08-31 | Semen 10 zak (Hamba Allah) | 550.000,00 | ||
2024-08-31 | Semen 10 zak ( mas Budi) | 560.000,00 | ||
2024-08-31 | Semen 20 zak (Mbak Mung) | 1.100.000,00 | ||
2024-08-31 | Semen 27 zak ( H. Darmanto (Bakul Swalayan)) | 1.485.000,00 | ||
2024-08-31 | Semen 10 zak ( Dila) | 550.000,00 | ||
2024-08-31 | Semen 10 zak (Hamba Allah) | 550.000,00 | ||
2024-08-31 | Semen 10 zak ( mas Budi) | 560.000,00 | ||
AHAD | ||||
2024-09-01 | Infak jalan tgl 1-9-2024 | 664.000,00 | ||
2024-09-01 | Bu suwarsih (alm) binti Saliyo | 2.000.000,00 | ||
2024-09-01 | Pak Sukarjo (Pulung Kencana) | 100.000,00 | ||
2024-09-01 | Mas Ipung Semangka/steam & windi Trisnawati (rek BSI) | 5.000.000,00 | ||
2024-09-01 | Acita Meihilda (rek BSI) | 1.500.000,00 | ||
2024-09-01 | Biaya tenaga pekerja 7 hari kerja | 8.505.000,00 | ||
2024-09-01 | Beli mesin Serkel tangan | 600.000,00 | ||
2024-09-01 | Belanja material - 1dus Paku 4" - 1pcs mata Bor kayu Haston 13mm | 330.000,00 | ||
2024-09-01 | Belanja Material - 1dus Paku 3" | 300.000,00 | ||
2024-09-01 | Semen 20zak (Pak Ripriyanto makarti) | 1.020.000,00 | ||
2024-09-01 | Semen 15 zak (Masrin) | 870.000,00 | ||
2024-09-01 | Semen 10zak (Hamba Allah) | 560.000,00 | ||
2024-09-01 | Semen 20zak (Pak Ripriyanto makarti) | 1.020.000,00 | ||
2024-09-01 | Semen 15 zak (Masrin) | 870.000,00 | ||
2024-09-01 | Semen 10zak (Hamba Allah) | 560.000,00 | ||
Total | 59.038.000,00 | 60.742.000,00 | - 1.704.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 1 September 2024 | - 1.704.000,00 | |||
SENIN | ||||
2024-09-02 | Infak jalan tgl 2-9-2024 | 850.000,00 | ||
2024-09-02 | Semen 20 zak (Hamba Allah) | 1.020.000,00 | ||
2024-09-02 | Semen 20 zak (Hamba Allah) | 1.020.000,00 | ||
SELASA | ||||
2024-09-03 | Infak jalan tgl 3-9-2024 | 940.000,00 | ||
2024-09-03 | Semen 10 zak (Mas Qori) | 550.000,00 | ||
2024-09-03 | Semen 10 zak (Mas Qori) | 550.000,00 | ||
2024-09-03 | Belanja material - 3psg sarung tangan karet Haston | 60.000,00 | ||
RABU | ||||
2024-09-04 | Infak jalan tgl 4-9-2024 | 1.050.000,00 | ||
2024-09-04 | Belanja material - 2pcs Linggis | 130.000,00 | ||
2024-09-04 | Semen 80 zak (H. Edison) | 4.560.000,00 | ||
2024-09-04 | Semen 80 zak (H. Edison) | 4.560.000,00 | ||
KAMIS | ||||
2024-09-05 | Infak jalan tgl 5-9-2024 | 665.000,00 | ||
2024-09-05 | Infak pasar pulung tgl 5-9-2024 | 860.000,00 | ||
2024-09-05 | Belanja material - 2ktk Paku beton DAIWA 2" | 50.000,00 | ||
2024-09-05 | Biaya sewa excavator pak mul dan sewa mobil 1hari tgl 3-9-2024 , ditanah pak pur (67rit (rincian 61rit masjid & 6rit pak pur) (Tahap 3) | 6.700.000,00 | ||
JUMAT | ||||
2024-09-06 | Infak jalan tgl 6-9-2024 | 1.400.000,00 | ||
2024-09-06 | Infak amplop pasar dayamurni 6-9-2024 | 710.000,00 | ||
2024-09-06 | Infak pasar Mulya Asri 6-9-2024 | 610.000,00 | ||
2024-09-06 | H. Karbiso (Dayamurni) | 200.000,00 | ||
2024-09-06 | Semen 20zak ( Hj. Tati) Pulung kencana | 1.100.000,00 | ||
2024-09-06 | Semen 2 zak ( Dzaky Asyrafil Hanif) | 110.000,00 | ||
2024-09-06 | Semen 20zak ( Hj. Tati) Pulung kencana | 1.100.000,00 | ||
2024-09-06 | Semen 2 zak ( Dzaky Asyrafil Hanif) | 110.000,00 | ||
SABTU | ||||
2024-09-07 | Infak jalan tgl 7-9-2024 | 800.000,00 | ||
2024-09-07 | Boiman (Toko NAZUA) simpang PU | 1.000.000,00 | ||
2024-09-07 | Hamba Allah (rek BSI) | 500.000,00 | ||
2024-09-07 | Batu Split 3kubik (Tb. Makmur) | 1.200.000,00 | ||
2024-09-07 | Batu Split 3kubik (Tb. Makmur) | 1.200.000,00 | ||
AHAD | ||||
2024-09-08 | Infak jalan tgl 8-9-2024 | 1.050.000,00 | ||
2024-09-08 | Bpk Surya Jaya Rades (Camat Tumijajar) (rek BSI) | 5.000.000,00 | ||
2024-09-08 | Yudi ayam (Julia Mardiana) (rek BSI) | 500.000,00 | ||
2024-09-08 | Johan wahyudi (Polisi Tbt) (rek BSI) | 500.000,00 | ||
2024-09-08 | Biaya tenaga pekerja 7 hari kerja | 8.635.000,00 | ||
2024-09-08 | Biaya berobat tenaga kerja | 498.000,00 | ||
2024-09-08 | Semen 20 zak (pak Suwandi jaya) | 1.100.000,00 | ||
2024-09-08 | Semen 10 zak (Margono) | 550.000,00 | ||
2024-09-08 | Semen 10 zak (muji Sunaryo) | 560.000,00 | ||
2024-09-08 | Semen 20 zak (pak Suwandi jaya) | 1.100.000,00 | ||
2024-09-08 | Semen 10 zak (Margono) | 550.000,00 | ||
2024-09-08 | Semen 10 zak (muji Sunaryo) | 560.000,00 | ||
2024-09-08 | Belanja material - 1dus Paku 4" | 300.000,00 | ||
Total | 25.681.000,00 | 27.123.000,00 | - 1.442.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 8 September 2024 | - 1.442.000,00 | |||
SENIN | ||||
2024-09-09 | Infak jalan tgl 9-9-2024 | 615.000,00 | ||
2024-09-09 | Semen 5 zak (Hamba Allah) | 550.000,00 | ||
2024-09-09 | Batu split 2rit 12kubik (H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-09-09 | Semen 10 zak (Bu Tarik) | 580.000,00 | ||
2024-09-09 | Semen 10 zak (Hamba Allah) | 560.000,00 | ||
2024-09-09 | Semen 5 zak (Hamba Allah) | 550.000,00 | ||
2024-09-09 | Batu split 2rit 12kubik (H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-09-09 | Semen 10 zak (Bu Tarik) | 580.000,00 | ||
2024-09-09 | Semen 10 zak (Hamba Allah) | 560.000,00 | ||
SELASA | ||||
2024-09-10 | Infak jalan tgl 10-9-2024 | 720.000,00 | ||
2024-09-10 | Bpk Restu (Dinas PU) (rek BSI) | 1.000.000,00 | ||
2024-09-10 | Sartika fitriyani (rek BSI) | 500.000,00 | ||
RABU | ||||
2024-09-11 | Infak jalan tgl 11-9-2024 | 610.000,00 | ||
2024-09-11 | Bpk Dasuki (kepala sekolah SMAN Mulya asri) (rek Bank Lampung) | 1.000.000,00 | ||
2024-09-11 | Bpk Wagino (alm) & Yuliati (alm) binti Wagino | 1.500.000,00 | ||
2024-09-11 | Biaya sewa Excavator pak mul mulai tgl 4-9-2024 s/d 8-9-2024 (15jam), untuk perataan tanah urug dihalaman masjid | 3.375.000,00 | ||
KAMIS | ||||
2024-09-12 | Infak jalan tgl 12-9-2024 | 1.090.000,00 | ||
2024-09-12 | Infak pasar pulung tgl 12-9-2024 | 1.050.000,00 | ||
2024-09-12 | Jual kubah Masjid (rek BSI a/n khoirul anwar) | 3.000.000,00 | ||
JUMAT | ||||
2024-09-13 | Infak jalan 13-9-2024 | 2.200.000,00 | ||
2024-09-13 | Infak amplop pasar dayamurni tgl 13-9-2024 | 800.000,00 | ||
2024-09-13 | Infak pasar Mulya asri tgl 13-9-2024 | 530.000,00 | ||
2024-09-13 | Semen 2 zak (Margono) | 116.000,00 | ||
2024-09-13 | Semen 2 zak ( Dzaky Asyrafil Hanif) | 110.000,00 | ||
2024-09-13 | Semen 2 zak (Margono) | 116.000,00 | ||
2024-09-13 | Belanja material - 1roll kawat bendrat 20kg - 1pcs meteran 7,5meter Tekiro | 400.000,00 | ||
2024-09-13 | Semen 2 zak ( Dzaky Asyrafil Hanif) | 110.000,00 | ||
2024-09-13 | Bpk Katri Maryudi (rek BSI) | 1.000.000,00 | ||
SABTU | ||||
2024-09-14 | Infak jalan tgl 14-9-2024 | 770.000,00 | ||
2024-09-14 | Infak SPP warga Rk. 02, Rt. 04 | 930.000,00 | ||
2024-09-14 | Infak SPP warga Rk. 02, Rt. 03 | 988.000,00 | ||
2024-09-14 | Infak SPP warga Rk. 02, Rt. 01 | 375.000,00 | ||
2024-09-14 | Infak SPP warga Rk. 02, Rt. 05 | 575.000,00 | ||
2024-09-14 | Beli Pasir 1 rit | 1.100.000,00 | ||
2024-09-14 | Belanja Material - 1 dus Paku 4" - 1pcs Mata Bor Kayu Haston 13mm - 20btg besi 10mm SNI full IBD - 1pcs Lampu tembak Hannoch 100watt - 1roll kabel Visicom 2x1,5 (25meter) | 2.230.000,00 | ||
2024-09-14 | Semen 50 zak ( Mbah Samino (alm) bin Suratijan dan Mbah Lasem (alm) binti Sadi) | 2.750.000,00 | ||
2024-09-14 | Semen 50 zak ( Mbah Samino (alm) bin Suratijan dan Mbah Lasem (alm) binti Sadi) | 2.750.000,00 | ||
AHAD | ||||
2024-09-15 | Infak jalan tgl 15-9-2024 | 710.000,00 | ||
2024-09-15 | Bakso Malang (Pulung kencana) | 4.000.000,00 | ||
2024-09-15 | SMA N Dayamurni | 500.000,00 | ||
2024-09-15 | Pak Sarijo | 500.000,00 | ||
2024-09-15 | Pak Arba'i (pulung kencana) | 200.000,00 | ||
2024-09-15 | Hamba Allah | 5.000,00 | ||
2024-09-15 | Pasir 1 rit (Bu Siti Pupuk) | 1.100.000,00 | ||
2024-09-15 | Pasir 1 rit ( Pak Imam, pulung kencana) | 1.100.000,00 | ||
2024-09-15 | Pasir 1 rit (Bu Siti pupuk) | 1.100.000,00 | ||
2024-09-15 | Pasir 1 rit ( Pak Imam, pulung kencana) | 1.100.000,00 | ||
2024-09-15 | Biaya Tenaga Pekerja 7 hari kerja | 8.035.000,00 | ||
Total | 35.192.000,00 | 26.606.000,00 | 8.586.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 15 September 2024 | 8.586.000,00 | |||
SENIN | ||||
2024-09-16 | Infak jalan tgl 16-9-2024 | 1.120.000,00 | ||
2024-09-16 | Semen 10 zak (Pak Saiman) | 550.000,00 | ||
2024-09-16 | Semen 10 zak (Pak Saiman) | 550.000,00 | ||
SELASA | ||||
2024-09-17 | Infak jalan tgl 17-9-2024 | 985.000,00 | ||
2024-09-17 | Mas Muchlisin | 400.000,00 | ||
2024-09-17 | Biaya lembur tenaga kerja merakit besi | 1.445.000,00 | ||
RABU | ||||
2024-09-18 | Infak jalan tgl 18-9-2024 | 500.000,00 | ||
2024-09-18 | Batu split 6kubik (H. Ahmad ansor (alm)) | 2.300.000,00 | ||
2024-09-18 | Batu split 6kubik (H. Ahmad ansor (alm)) | 2.300.000,00 | ||
2024-09-18 | Belanja Material - 10btg besi 10mm SNI full IBD | 690.000,00 | ||
KAMIS | ||||
2024-09-19 | Infak jalan tgl 19-9-2024 | 945.000,00 | ||
2024-09-19 | Pak Slamet Eva Kurniawan (unit 2) | 1.000.000,00 | ||
2024-09-19 | Batu split 6kubik ( H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
2024-09-19 | Batu split 6kubik ( H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
JUMAT | ||||
2024-09-20 | Infak jalan tgl 20-9-2024 | 1.105.000,00 | ||
2024-09-20 | Infak amplop pasar dayamurni 20-9-2024 | 1.040.000,00 | ||
2024-09-20 | Belanja material - 1roll kawat bendrat 20kg | 320.000,00 | ||
2024-09-20 | Semen 2 zak (Pak Margono) | 110.000,00 | ||
2024-09-20 | Semen 20zak (Pak Suherman toib dan Harun Hartono) | 1.120.000,00 | ||
2024-09-20 | Semen 25 zak (Hamba Allah) | 1.375.000,00 | ||
2024-09-20 | Semen 2 zak (Pak Margono) | 110.000,00 | ||
2024-09-20 | Semen 20zak (Pak Suherman toib dan Harun Hartono) | 1.120.000,00 | ||
2024-09-20 | Semen 25 zak (Hamba Allah) | 1.375.000,00 | ||
SABTU | ||||
2024-09-21 | Infak jalan tgl 21-9-2024 | 1.170.000,00 | ||
2024-09-21 | Semen 2 zak ( Mbk Insyi Nur'aini) | 110.000,00 | ||
2024-09-21 | Semen 2 zak ( Mbk Insyi Nur'aini) | 110.000,00 | ||
AHAD | ||||
2024-09-22 | Infak jalan tgl 22-9-2024 | 640.000,00 | ||
2024-09-22 | Infak pasar pulung kencana tgl 22-9-2024 | 910.000,00 | ||
2024-09-22 | Biaya tenaga pekerja 7 hari kerja | 8.580.000,00 | ||
Total | 26.266.000,00 | 18.900.000,00 | 7.366.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 22 September 2024 | 7.366.000,00 | |||
SENIN | ||||
2024-09-23 | Infak jalan tgl 23-9-2024 | 880.000,00 | ||
2024-09-23 | Karsini binti Boimin dan Bambang Saputra bin Sutaryo | 2.000.000,00 | ||
2024-09-23 | Pak Maman Semangka | 2.000.000,00 | ||
SELASA | ||||
2024-09-24 | Infak jalan tgl 24-9-2024 | 650.000,00 | ||
2024-09-24 | Konsumsi rapat evaluasi tgl 24-9-2024 | 150.000,00 | ||
2024-09-24 | Belanja material - 1ktk Paku beton DAIWA 2" - 1ktk Paku beton DAIWA 3" | 60.000,00 | ||
RABU | ||||
2024-09-25 | Infak jalan tgl 25-9-2024 | 446.000,00 | ||
2024-09-25 | H. Mustofa | 1.000.000,00 | ||
2024-09-25 | Belanja material - 1ls benang nilon roll tanggung | 60.000,00 | ||
KAMIS | ||||
2024-09-26 | Infak jalan tgl 26-9-2024 | 806.000,00 | ||
2024-09-26 | Beli Batu Belah 2rit | 3.200.000,00 | ||
2024-09-26 | Beli Bata 10.000 pcs | 6.750.000,00 | ||
2024-09-26 | Pasir 5 rit ( H. Kholil) | 5.500.000,00 | ||
2024-09-26 | Belanja material - 2glg kawat seng - 5pcs lampu LED POTENZ 42watt - 5pcs fitting gantung TOFUDA - 2roll kabel transparan 2x80 20meter - 5pcs colokan pipih LOYAL - 1pcs Isolasi UNIBEL | 458.000,00 | ||
2024-09-26 | Belanja material - 2roll kabel transparan 2x80 20meter - 7pcs fitting gantung TOFUDA | 135.000,00 | ||
2024-09-26 | Pasir 5 rit ( H. Kholil) | 5.500.000,00 | ||
JUMAT | ||||
2024-09-27 | Infak jalan tgl 27-9-2024 | 1.050.000,00 | ||
2024-09-27 | Infak amplop pasar dayamurni 27-9-2024 | 605.000,00 | ||
2024-09-27 | Infak pasar Mulya Asri tgl 27-9-2024 | 550.000,00 | ||
2024-09-27 | Biaya tanah urug 12rit | 1.200.000,00 | ||
2024-09-27 | Semen 20zak (Hamba Allah) | 1.100.000,00 | ||
2024-09-27 | Semen 2 zak ( mbk Insyi Nur'aini) | 110.000,00 | ||
2024-09-27 | Semen 20zak (Hamba Allah) | 1.100.000,00 | ||
2024-09-27 | Semen 2 zak ( mbk Insyi Nur'aini) | 110.000,00 | ||
SABTU | ||||
2024-09-28 | Infak jalan tgl 28-9-2024 | 550.000,00 | ||
AHAD | ||||
2024-09-29 | Infak jalan tgl 29-9-2024 | 1.850.000,00 | ||
2024-09-29 | Infak pasar Pulung Kencana tgl 29-9-2024 | 910.000,00 | ||
2024-09-29 | Biaya tenaga pekerja 7 hari kerja + lembur | 9.150.000,00 | ||
2024-09-29 | Belanja material - 6dus Glassblok | 870.000,00 | ||
Total | 27.373.000,00 | 28.743.000,00 | - 1.370.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 29 September 2024 | - 1.370.000,00 | |||
SENIN | ||||
2024-09-30 | Infak jalan tgl 30-9-2024 | 930.000,00 | ||
2024-09-30 | Hj. Rukiyah (alm) binti Anjhodi Ibrahim | 1.000.000,00 | ||
2024-09-30 | Infak SPP warga Rk. 02, Rt. 01 | 1.040.000,00 | ||
2024-09-30 | Infak SPP warga Rk. 02, Rt. 07 | 960.000,00 | ||
2024-09-30 | Infak SPP warga Rk. 02, Rt. 03 | 760.000,00 | ||
2024-09-30 | Infak SPP warga Rk. 02, Rt. 04 | 700.000,00 | ||
2024-09-30 | Belanja material - 1dus Paku 4" - 1pcs Ban dalam ARTCO | 320.000,00 | ||
SELASA | ||||
2024-10-01 | Infak jalan tgl 1-10-2024 | 650.000,00 | ||
2024-10-01 | H. Abdullah RM. Abdi Sultan (Bandar Lampung) | 300.000,00 | ||
2024-10-01 | Semen 100zak - Bu Rasini (alm) Binti Karjono - Bp. Sastro Utomo (alm) Bin Amat Kasan - Bu Sariah (alm) Binti Iman Diryo - Bp. Marto Diryo (alm) Bin Merto Semito - Bu Misinem (alm) Binti Katimin {Keluarga H. Seno & Hj. Wanti} | 5.500.000,00 | ||
2024-10-01 | Semen 100zak - Bu Rasini (alm) Binti Karjono - Bp. Sastro Utomo (alm) Bin Amat Kasan - Bu Sariah (alm) Binti Iman Diryo - Bp. Marto Diryo (alm) Bin Merto Semito - Bu Misinem (alm) Binti Katimin {Keluarga H. Seno & Hj. Wanti} | 5.500.000,00 | ||
2024-10-01 | Beli Bata 10.000 pcs | 6.750.000,00 | ||
2024-10-01 | Beli Batu belah 1 rit | 1.600.000,00 | ||
2024-10-01 | Belanja material - 10btg besi 16mm ulir SNI - 50btg besi 10mm full SNI IBD | 5.050.000,00 | ||
RABU | ||||
2024-10-02 | Infak jalan tgl 2-10-2024 | 1.200.000,00 | ||
2024-10-02 | Pasir 1 rit (Pak Nasir Daya asri) | 1.100.000,00 | ||
2024-10-02 | Pasir 1 rit (Mas Hendri (Toko Pakan ayam) ) Daya asri | 1.100.000,00 | ||
2024-10-02 | Pasir 1 rit (Pak Nasir Daya asri) | 1.100.000,00 | ||
2024-10-02 | Pasir 1 rit (Mas Hendri (Toko Pakan ayam) ) Daya asri | 1.100.000,00 | ||
KAMIS | ||||
2024-10-03 | Infak jalan tgl 3-10-2024 | 600.000,00 | ||
2024-10-03 | Bu Yuliana (rek BSI) - Pak kamad (alm) bin Karto Akad - Bu Wasiah (alm) binti Mat kasim | 500.000,00 | ||
2024-10-03 | Pak Asmo Wiyono | 500.000,00 | ||
2024-10-03 | Pasir 1 rit ( Pak Imam, Dayamurni) | 1.100.000,00 | ||
2024-10-03 | Pasir 1 rit ( Pak Imam, Dayamurni) | 1.100.000,00 | ||
2024-10-03 | Belanja Material - 30btg Besi 8mm full SNI KSTY | 1.560.000,00 | ||
JUMAT | ||||
2024-10-04 | Infak jalan tgl 4-10-2024 | 1.200.000,00 | ||
2024-10-04 | Infak amplop pasar Dayamurni 4-10-2024 | 830.000,00 | ||
2024-10-04 | Infak pasar Mulya asri tgl 4-10-2024 | 600.000,00 | ||
2024-10-04 | Semen 2 zak ( Bu Insyi Nur'aini) | 110.000,00 | ||
2024-10-04 | Semen 10zak (Dr. Dwi Marinda) | 550.000,00 | ||
2024-10-04 | Semen 2 zak ( Bu Insyi Nur'aini) | 110.000,00 | ||
2024-10-04 | Semen 10zak (Dr. Dwi Marinda) | 550.000,00 | ||
2024-10-04 | Belanja Material - 50 btg besi 6mm SNI KSTY - 10pcs mata potong gerinda besi HASTON | 1.640.000,00 | ||
SABTU | ||||
2024-10-05 | Infak jalan tgl 5-10-2024 | 1.060.000,00 | ||
2024-10-05 | H. Karbiso (Dayamurni) | 300.000,00 | ||
AHAD | ||||
2024-10-06 | Infak jalan tgl 6-10-2024 | 815.000,00 | ||
2024-10-06 | Infak pasar Pulung 6-10-2024 | 910.000,00 | ||
2024-10-06 | Hj. Ginah (Dayamurni) | 500.000,00 | ||
2024-10-06 | Biaya tenaga pekerja 7 hari kerja | 7.750.000,00 | ||
2024-10-06 | Belanja material - 1roll kawat bendrat -+20kg | 320.000,00 | ||
Total | 23.445.000,00 | 34.450.000,00 | - 11.005.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 6 Oktober 2024 | - 11.005.000,00 | |||
SENIN | ||||
2024-10-07 | Infak jalan tgl 7-10-2024 | 1.300.000,00 | ||
2024-10-07 | Infak pasar Dayamurni subuh 7-10-2024 | 400.000,00 | ||
2024-10-07 | Belanja material - 3btg PVC 3" Rucika AQ - 3pcs knie 3 Rucika D - 1ktk paku beton DAIWA 2" | 655.000,00 | ||
2024-10-07 | Semen 30zak ( H. Rakiman, Dayamurni) | 1.650.000,00 | ||
2024-10-07 | Semen 30zak ( H. Rakiman, Dayamurni) | 1.650.000,00 | ||
SELASA | ||||
2024-10-08 | Infak jalan tgl 8-10-2024 | 650.000,00 | ||
RABU | ||||
2024-10-09 | Infak jalan tgl 9-10-2024 | 520.000,00 | ||
2024-10-09 | Bp Maryono (alm) | 300.000,00 | ||
2024-10-09 | Biaya tanah urug 60rit | 6.000.000,00 | ||
2024-10-09 | Belanja material - 5pcs Ember cor oange bagus | 35.000,00 | ||
2024-10-09 | Batu split 2kubik (TB. MAKMUR) | 800.000,00 | ||
2024-10-09 | Batu split 2kubik (TB. MAKMUR) | 800.000,00 | ||
KAMIS | ||||
2024-10-10 | Infak jalan tgl 10-10-2024 | 640.000,00 | ||
2024-10-10 | Batu split 6kubik ( H. Ahmad Ansor (Alm)) | 2.300.000,00 | ||
2024-10-10 | Batu split 6kubik ( H. Ahmad Ansor (Alm)) | 2.300.000,00 | ||
JUMAT | ||||
2024-10-11 | Infak jalan tgl 11-10-2024 | 1.230.000,00 | ||
2024-10-11 | Infak amplop pasar Dayamurni tgl 11-10-2024 | 630.000,00 | ||
2024-10-11 | Infak pasar Mulya asri tgl 11-10-2024 | 520.000,00 | ||
2024-10-11 | - Erdi Gunawan (alm) bin Rusland - Nurwiyati Binti Misri adi - Ditya ambar dewi binti Erdi gunawan | 1.000.000,00 | ||
2024-10-11 | Pasir 1 rit (Pak Suryono/pak embing) | 1.100.000,00 | ||
2024-10-11 | Semen 2 zak (Bu Insyi Nur'aini) | 110.000,00 | ||
2024-10-11 | Pasir 1 rit (Pak Suryono/pak embing) | 1.100.000,00 | ||
2024-10-11 | Belanja material - 1klg cat pylox - 1pcs lakban hitam - 1pcs meteran 5m IGM | 62.000,00 | ||
2024-10-11 | Semen 2 zak (Bu Insyi Nur'aini) | 110.000,00 | ||
SABTU | ||||
2024-10-12 | Infak jalan tgl 12-10-2024 | 900.000,00 | ||
2024-10-12 | Mbah Suraji | 1.000.000,00 | ||
2024-10-12 | Bu Jumiyati khoirul (Dayamurni) | 1.000.000,00 | ||
2024-10-12 | Semen 25zak ( Bu Tati, ( tempel) ) | 1.425.000,00 | ||
2024-10-12 | Semen 15zak ( Bu Tati (Tempel)) | 855.000,00 | ||
2024-10-12 | Semen 25zak ( Bu Tati, ( tempel) ) | 1.425.000,00 | ||
2024-10-12 | Semen 15zak ( Bu Tati (Tempel)) | 855.000,00 | ||
2024-10-12 | Belanja material - 50btg besi 10mm Full SNI IBD | 3.450.000,00 | ||
AHAD | ||||
2024-10-13 | Infak jalan tgl 13-10-2024 | 600.000,00 | ||
2024-10-13 | Infak pasar Pulung Kencana tgl 13-10-2024 | 760.000,00 | ||
2024-10-13 | Biaya tenaga pekerja 7 hari kerja | 7.665.000,00 | ||
Total | 8.685.000,00 | 26.107.000,00 | - 17.422.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 13 Oktober 2024 | - 17.422.000,00 | |||
SENIN | ||||
2024-10-14 | Infak jalan tgl 14-10-2024 | 1.670.000,00 | ||
2024-10-14 | Infak pasar Dayamurni pagi tgl 14-10-2024 | 330.000,00 | ||
2024-10-14 | Semen 2 zak (Bu Yoso) | 116.000,00 | ||
2024-10-14 | Semen 50zak , NONA ( Bp NOvriwan & Bp NAdirsyah) | 2.750.000,00 | ||
2024-10-14 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
2024-10-14 | Semen 2 zak (Bu Yoso) | 116.000,00 | ||
2024-10-14 | Belanja Material - 25pcs Mata potong besi gerinda HASTON | 90.000,00 | ||
2024-10-14 | Semen 50zak , NONA ( Bp NOvriwan & Bp NAdirsyah) | 2.750.000,00 | ||
2024-10-14 | Semen 10zak (Hamba Allah) | 550.000,00 | ||
SELASA | ||||
2024-10-15 | Infak jalan tgl 15-10-2024 | 760.000,00 | ||
2024-10-15 | H. Yulisir (Dayamurni) | 1.000.000,00 | ||
2024-10-15 | ROY | 152.000,00 | ||
2024-10-15 | Belanja Material - 50btg besi 10mm SNI full IBD - 50btg besi 6mm SNI KSTY | 5.050.000,00 | ||
RABU | ||||
2024-10-16 | Infak jalan tgl 16-10-2024 | 650.000,00 | ||
2024-10-16 | Bu Maulida Zahro ( DPR Provinsi Lampung) | 5.000.000,00 | ||
2024-10-16 | Belanja material - 1roll kawat bendrat | 320.000,00 | ||
KAMIS | ||||
2024-10-17 | Infak jalan tgl 17-10-2024 | 310.000,00 | ||
2024-10-17 | Bp. Wira Pralaga (Pj. Camat Tumijajar) | 300.000,00 | ||
JUMAT | ||||
2024-10-18 | Infak jalan tgl 18-10-2024 | 1.050.000,00 | ||
2024-10-18 | Infak amplop pasar Dayamurni 18-10-2024 | 850.000,00 | ||
2024-10-18 | Infak pasar Mulya asri 18-10-2024 | 575.000,00 | ||
2024-10-18 | Infak SPP warga Rk. 02, Rt. 06 | 380.000,00 | ||
2024-10-18 | Infak SPP warga Rk. 02, Rt. 05 | 730.000,00 | ||
2024-10-18 | Belanja material - 1dus Paku 4" | 300.000,00 | ||
2024-10-18 | Semen 15zak (Bu Murwati) | 825.000,00 | ||
2024-10-18 | Semen 36zak (H. Fari) | 1.980.000,00 | ||
2024-10-18 | Semen 2zak (Bu Entin Wartinah (alm)) | 110.000,00 | ||
2024-10-18 | Semen 15zak (Bu Murwati) | 825.000,00 | ||
2024-10-18 | Semen 36zak (H. Fari) | 1.980.000,00 | ||
2024-10-18 | Semen 2zak (Bu Entin Wartinah (alm)) | 110.000,00 | ||
SABTU | ||||
2024-10-19 | Infak jalan tgl 19-10-2024 | 475.000,00 | ||
2024-10-19 | Belanja material - 1btg PVC 3" RUCIKA AQ - 2ktk Paku beton DAIWA 4" | 270.000,00 | ||
2024-10-19 | Semen 10zak M.P( Bp. Wawan JK (alm)) | 500.000,00 | ||
2024-10-19 | Semen 10zak M.P( Bp. Wawan JK (alm)) | 500.000,00 | ||
AHAD | ||||
2024-10-20 | Infak jalan tgl 20-10-2024 | 1.015.000,00 | ||
2024-10-20 | Infak pasar pulung kencana tgl 20-10-2024 | 780.000,00 | ||
2024-10-20 | H. Mustofa | 1.000.000,00 | ||
2024-10-20 | Hamba Allah | 1.000.000,00 | ||
2024-10-20 | Beli bata 2000pcs | 1.250.000,00 | ||
2024-10-20 | Biaya tenaga pekerja 7 hari kerja | 7.865.000,00 | ||
Total | 7.436.000,00 | 21.976.000,00 | - 14.540.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 20 Oktober 2024 | - 14.540.000,00 | |||
SENIN | ||||
2024-10-21 | Infak jalan tgl 21-10-2024 | 630.000,00 | ||
2024-10-21 | Infak pasar dayamurni pagi | 515.000,00 | ||
2024-10-21 | Beli bata 2000pcs | 1.250.000,00 | ||
SELASA | ||||
2024-10-22 | Infak jalan tgl 22-10-2024 | 720.000,00 | ||
2024-10-22 | H. Giri | 1.000.000,00 | ||
2024-10-22 | Pak cecep ramdani (rek BSI) | 1.000.000,00 | ||
2024-10-22 | Bu Endang setianingsih (rek Bank Lampung) | 2.000.000,00 | ||
2024-10-22 | Bu Sri Mustika (Kepala sekolah SMP 1 Tumi jajar) (rek Bank Lampung) | 500.000,00 | ||
2024-10-22 | Belanja material - 10lbr Triplek 9mm Palem - 2lbr Triplek 3mm biasa - 2kg Paku triplek 1 1/4" - 1kg paku 2" | 1.507.000,00 | ||
RABU | ||||
2024-10-23 | Infak jalan tgl 23-10-2024 | 1.240.000,00 | ||
2024-10-23 | Beli bata 10.000 pcs | 6.750.000,00 | ||
2024-10-23 | Pasir 2 rit (Pak Sudirman (KBA lapak singkong) | 2.200.000,00 | ||
2024-10-23 | Pasir 1 rit ( Pak Embing) | 1.100.000,00 | ||
2024-10-23 | Batu split 2 rit (12kubik) (H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-10-23 | Pasir 2 rit (Pak Sudirman (KBA lapak singkong) | 2.200.000,00 | ||
2024-10-23 | Pasir 1 rit ( Pak Embing) | 1.100.000,00 | ||
2024-10-23 | Batu split 2 rit (12kubik) (H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-10-23 | H. Zulherman (Toko pecah belah) | 5.500.000,00 | ||
2024-10-23 | Hamba Allah | 50.000,00 | ||
KAMIS | ||||
2024-10-24 | Infak jalan tgl 24-10-2024 | 665.000,00 | ||
2024-10-24 | Mas Jamal | 2.000.000,00 | ||
2024-10-24 | Mas Sugi purwosari (rek BSI) | 2.200.000,00 | ||
2024-10-24 | Belanja material - 2ktk Paku beton DAIWA 3" | 70.000,00 | ||
2024-10-24 | Bambu 300btg (Mas Ari Gunawan) | 1.800.000,00 | ||
2024-10-24 | Bambu 300btg (Mas Ari Gunawan) | 1.800.000,00 | ||
JUMAT | ||||
2024-10-25 | Infak jalan tgl 25-10-2024 | 1.060.000,00 | ||
2024-10-25 | Infak amplop pasar dayamurni tgl 25-10-2024 | 765.000,00 | ||
2024-10-25 | Infak pasar mulya asri tgl 25-10-2024 | 500.000,00 | ||
2024-10-25 | Pak Saring Santoso dan Bu Umi astuti | 1.500.000,00 | ||
2024-10-25 | Pak supardiono dan Bu Peni sugiarti | 1.000.000,00 | ||
2024-10-25 | Pak Sabar aryono | 1.100.000,00 | ||
2024-10-25 | Belanja material - 10lbr triplek 9mm palem - 3lbr triplek 3mm | 1.440.000,00 | ||
2024-10-25 | Semen 2 zak ( Bp. Nasuha (alm)) | 110.000,00 | ||
2024-10-25 | Batu split 1 rit 6kubik ( Bpk Bakri (alm) bin Matal, Kristanto bin Bakri, Krisomanto bin Bakri) | 2.300.000,00 | ||
2024-10-25 | Semen 11zak ( H. Karyan (alm) bin Aspio, Hj. Mitri (alm) binti Sebat, Pak Saban (alm) bin kamad, Bu Rasnio binti fulan, Bp Aspio bin fulan) | 605.000,00 | ||
2024-10-25 | Pasir 1 rit (Pak embing) | 1.100.000,00 | ||
2024-10-25 | Semen 2 zak ( Bp. Nasuha (alm)) | 110.000,00 | ||
2024-10-25 | Batu split 1 rit 6kubik ( Bpk Bakri (alm) bin Matal, Kristanto bin Bakri, Krisomanto bin Bakri) | 2.300.000,00 | ||
2024-10-25 | Semen 11zak ( H. Karyan (alm) bin Aspio, Hj. Mitri (alm) binti Sebat, Pak Saban (alm) bin kamad, Bu Rasnio binti fulan, Bp Aspio bin fulan) | 605.000,00 | ||
2024-10-25 | Pasir 1 rit (Pak embing) | 1.100.000,00 | ||
SABTU | ||||
2024-10-26 | Infak jalan tgl 26-10-2024 | 340.000,00 | ||
2024-10-26 | Belanja material - 2kg paku triplek 1 1/4" | 50.000,00 | ||
2024-10-26 | Besi 16mm ulir KSTY 124btg (H. Subur) | 26.040.000,00 | ||
2024-10-26 | Besi 16mm ulir KSTY 124btg (H. Subur) | 26.040.000,00 | ||
AHAD | ||||
2024-10-27 | Infak jalan tgl 27-10-2024 | 2.910.000,00 | ||
2024-10-27 | Infak pasar pulung kencana tgl 27-10-2024 | 780.000,00 | ||
2024-10-27 | Biaya tenaga pekerja 7 hari kerja + lembur | 8.350.000,00 | ||
2024-10-27 | Belanja material - 5btg Jidar alumunium 6meter - 1ls Benang Nilon roll tanggung | 710.000,00 | ||
Total | 53.290.000,00 | 59.982.000,00 | - 6.692.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 27 Oktober 2024 | - 6.692.000,00 | |||
SENIN | ||||
2024-10-28 | Infak jalan tgl 28-10-2024 | 410.000,00 | ||
2024-10-28 | Infak pasar dayamurni pagi tgl 28-10-2024 | 440.000,00 | ||
SELASA | ||||
2024-10-29 | Infak jalan tgl 29-10-2024 | 580.000,00 | ||
2024-10-29 | Semen 10zak (Pak Wasidi) | 550.000,00 | ||
2024-10-29 | Semen 10zak (Pak Wasidi) | 550.000,00 | ||
RABU | ||||
2024-10-30 | Infak jalan tgl 30-10-2024 | 380.000,00 | ||
2024-10-30 | Mas Ari Gunawan | 200.000,00 | ||
2024-10-30 | Beli pasir 2 rit | 2.200.000,00 | ||
2024-10-30 | Semen 10zak MP (Pak Sunaryo) | 520.000,00 | ||
2024-10-30 | Semen 10zak MP (Pak Sunaryo) | 520.000,00 | ||
KAMIS | ||||
2024-10-31 | Infak jalan tgl 31-10-2024 | 535.000,00 | ||
2024-10-31 | Infak pasar pulung kencana tgl 31-10-2024 | 660.000,00 | ||
2024-10-31 | Bambu 300 batang (Hamba Allah) | 1.800.000,00 | ||
2024-10-31 | Bambu 300 batang (Hamba Allah) | 1.800.000,00 | ||
JUMAT | ||||
2024-11-01 | Infak jalan tgl 1-11-2024 | 955.000,00 | ||
2024-11-01 | Infak amplop pasar dayamurni tgl 1-11-2024 | 520.000,00 | ||
2024-11-01 | Infak pasar mulya asri tgl 1-11-2024 | 610.000,00 | ||
2024-11-01 | H. Supardan | 6.000.000,00 | ||
2024-11-01 | H. Saelan | 950.000,00 | ||
2024-11-01 | Semen 100 zak (Hamba Allah) | 5.500.000,00 | ||
2024-11-01 | Semen 10 zak ( Uda Mahyunar dan Bu Kusmaini) | 550.000,00 | ||
2024-11-01 | Semen 25zak ( Mas April) | 1.375.000,00 | ||
2024-11-01 | Semen 2 zak (Mbah Fatimah) | 116.000,00 | ||
2024-11-01 | Semen 100 zak (Hamba Allah) | 5.500.000,00 | ||
2024-11-01 | Semen 10 zak ( Uda Mahyunar dan Bu Kusmaini) | 550.000,00 | ||
2024-11-01 | Semen 25zak ( Mas April) | 1.375.000,00 | ||
2024-11-01 | Belanja material - 25btg besi 10mm full SNI IBD | 1.725.000,00 | ||
2024-11-01 | Belanja material - 5pcs bak cor bagus | 75.000,00 | ||
2024-11-01 | Semen 2 zak (Mbah Fatimah) | 116.000,00 | ||
SABTU | ||||
2024-11-02 | Infak jalan tgl 2-11-2024 | 1.130.000,00 | ||
2024-11-02 | Bp kholudin | 1.000.000,00 | ||
2024-11-02 | Semen 2 zak ( Bu Entin wartinah (alm)) | 110.000,00 | ||
2024-11-02 | Semen 2 zak ( Bu Entin wartinah (alm)) | 110.000,00 | ||
AHAD | ||||
2024-11-03 | Infak jalan tgl 3-11-2024 | 370.000,00 | ||
2024-11-03 | Mas Yanto (pecel lele) | 500.000,00 | ||
2024-11-03 | Biaya tenaga kerja 7 hari kerja | 8.510.000,00 | ||
2024-11-03 | Besi 16mm ulir 50btg (Hamba Allah) | 10.000.000,00 | ||
2024-11-03 | Besi 16mm ulir 50btg (Hamba Allah) | 10.000.000,00 | ||
2024-11-03 | Belanja material - 1 roll kawat bendrat -+20kg | 320.000,00 | ||
Total | 29.069.000,00 | 33.351.000,00 | - 4.282.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 3 November 2024 | - 4.282.000,00 | |||
SENIN | ||||
2024-11-04 | Infak jalan tgl 4-11-2024 | 1.065.000,00 | ||
2024-11-04 | Infak pasar daya murni pagi tgl 4-11-2024 | 415.000,00 | ||
2024-11-04 | Semen 6 zak ( Warga Daya asri Rk. 02, Rt. 07) | 330.000,00 | ||
2024-11-04 | Semen 6 zak ( Warga Daya asri Rk. 02, Rt. 07) | 330.000,00 | ||
SELASA | ||||
2024-11-05 | Infak jalan tgl 5-11-2024 | 790.000,00 | ||
2024-11-05 | Semen 10 zak MP (Bu Nusi (alm)) | 520.000,00 | ||
2024-11-05 | Semen 10 zak MP (Bu Nusi (alm)) | 520.000,00 | ||
RABU | ||||
2024-11-06 | Infak jalan tgl 6-11-2024 | 1.010.000,00 | ||
2024-11-06 | Pak cecep ramdani (rek BSI) | 1.000.000,00 | ||
2024-11-06 | Pasir 1 rit (warga daya asri Rk. 02, Rt. 07) | 1.100.000,00 | ||
2024-11-06 | Pasir 1 rit (warga daya asri Rk. 02, Rt. 07) | 1.100.000,00 | ||
KAMIS | ||||
2024-11-07 | Infak jalan tgl 7-11-2024 | 500.000,00 | ||
2024-11-07 | Biaya serkel kayu -+6 kubik | 2.930.000,00 | ||
JUMAT | ||||
2024-11-08 | Infak jalan tgl 8-11-2024 | 1.440.000,00 | ||
2024-11-08 | Infak amplop pasar dayamurni tgl 8-11-2024 | 945.000,00 | ||
2024-11-08 | Infak pasar mulya asri tgl 8-11-2024 | 580.000,00 | ||
2024-11-08 | Semen 10 zak (Pak Misri) | 550.000,00 | ||
2024-11-08 | Semen 10 zak (Pak Misri) | 550.000,00 | ||
SABTU | ||||
2024-11-09 | Mas Sandi | 1.000.000,00 | ||
2024-11-09 | Infak jalan tgl 9-11-2024 | 1.590.000,00 | ||
AHAD | ||||
2024-11-10 | Infak jalan tgl 10-11-2024 | 470.000,00 | ||
2024-11-10 | Pak sulistiyanto | 1.000.000,00 | ||
2024-11-10 | Pak Dalail | 1.000.000,00 | ||
2024-11-10 | Pak Paidi | 1.000.000,00 | ||
2024-11-10 | Biaya tenaga pekerja 7 hari kerja | 5.135.000,00 | ||
2024-11-10 | Biaya serkel kayu -+ 7,5 kubik | 4.486.000,00 | ||
2024-11-10 | Infak pasar pulung kencana tgl 10-11-2024 | 770.000,00 | ||
Total | 12.793.000,00 | 15.051.000,00 | - 2.258.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 10 November 2024 | - 2.258.000,00 | |||
SENIN | ||||
2024-11-11 | Infak jalan tgl 11-11-2024 | 320.000,00 | ||
2024-11-11 | Biaya serkel kayu papan | 1.790.000,00 | ||
2024-11-11 | Belanja material - 25btg besi 10mm full IBD SNI - 25pcs Mata gerinda potong besi IWA | 1.805.000,00 | ||
2024-11-11 | Infak pasar dayamurni pagi 11-11-2024 | 480.000,00 | ||
SELASA | ||||
2024-11-12 | Infak jalan tgl 12-11-2024 | 810.000,00 | ||
2024-11-12 | Bp Junaidi dan Bu Manip | 500.000,00 | ||
2024-11-12 | H. Dalari (alm) dan Hj. Sampun | 2.000.000,00 | ||
2024-11-12 | Muhammad Rifki pratama (rek BSI) | 230.000,00 | ||
2024-11-12 | Biaya serkel kayu papan -+3,2kubik | 1.799.000,00 | ||
RABU | ||||
2024-11-13 | Infak jalan tgl 13-11-2024 | 615.000,00 | ||
2024-11-13 | Pak Ratino | 250.000,00 | ||
2024-11-13 | Biaya serkel kayu usuk -+2,3 kubik | 1.500.000,00 | ||
2024-11-13 | Semen 10zak MP(Bu musi (alm) ) | 520.000,00 | ||
2024-11-13 | Bambu 1rit ( -+ 700btg ) (PT. GGP) | 0,00 | ||
2024-11-13 | Semen 10zak MP(Bu musi (alm) ) | 520.000,00 | ||
2024-11-13 | Bambu 1rit ( -+ 700btg ) (PT. GGP) | 0,00 | ||
KAMIS | ||||
2024-11-14 | Infak jalan tgl 14-11-2024 | 620.000,00 | ||
2024-11-14 | Beli pasir 2rit (dari lapak) | 3.000.000,00 | ||
2024-11-14 | Beli pasir 2rit | 2.200.000,00 | ||
2024-11-14 | Belanja material - 2lbr terpal 6x8 A4 - 1ktk paku beton DAIWA 3" | 635.000,00 | ||
JUMAT | ||||
2024-11-15 | Infak jalan tgl 15-11-2024 | 900.000,00 | ||
2024-11-15 | Infak amplop pasar dayamurni tgl 15-11-2024 | 837.000,00 | ||
2024-11-15 | Bu Triyati (Daya sakti) | 1.000.000,00 | ||
2024-11-15 | Mas Yudi (ayam) Dayamurni | 1.000.000,00 | ||
2024-11-15 | Pak setiono | 300.000,00 | ||
2024-11-15 | H. Ahmad Ansor (alm) (dari Pak Mirwan& umi) | 2.500.000,00 | ||
2024-11-15 | Beli pasir 1 rit | 1.100.000,00 | ||
2024-11-15 | Bambu 1rit ( -+ 700btg ) (PT. GGP) | 0,00 | ||
2024-11-15 | Bambu 1rit ( -+ 700btg ) (PT. GGP) | 0,00 | ||
SABTU | ||||
2024-11-16 | Infak jalan tgl 16-11-2024 | 340.000,00 | ||
AHAD | ||||
2024-11-17 | Infak jalan tgl 17-11-2024 | 5.330.000,00 | ||
2024-11-17 | Infak pasar pulung kencana 17-11-2024 | 810.000,00 | ||
2024-11-17 | Biaya tenaga kerja 7 hari kerja | 5.595.000,00 | ||
2024-11-17 | Biaya tutuh kayu | 250.000,00 | ||
2024-11-17 | Beli pasir 2 rit | 2.200.000,00 | ||
Total | 17.104.000,00 | 22.394.000,00 | - 5.290.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 17 November 2024 | - 5.290.000,00 | |||
SENIN | ||||
2024-11-18 | Infak jalan tgl 18-11-2024 | 760.000,00 | ||
2024-11-18 | Infak pasar dayamurni pagi tgl 18-11-2024 | 300.000,00 | ||
2024-11-18 | Belanja material - 1dus paku 4" - 3kg paku 3,5" - 1pcs mata bor beton 12mm BOSCH CYL-4 - 1pcs mata bor beton 12mm BENZ 210mm | 435.000,00 | ||
2024-11-18 | Batu split 2rit (12kubik) ( H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-11-18 | Bambu -+ 230btg (Hamba Allah) | 0,00 | ||
2024-11-18 | Batu split 2rit (12kubik) ( H. Ahmad Ansor (alm)) | 4.600.000,00 | ||
2024-11-18 | Bambu -+ 230btg (Hamba Allah) | 0,00 | ||
SELASA | ||||
2024-11-19 | Infak jalan tgl 19-11-2024 | 558.000,00 | ||
2024-11-19 | Pak warno (pasir) | 50.000,00 | ||
2024-11-19 | Beli pasir 2rit | 2.200.000,00 | ||
2024-11-19 | Semen 1 zak Hamba Allah (PANARAGAN) | 57.000,00 | ||
2024-11-19 | Semen 1 zak Hamba Allah (PANARAGAN) | 57.000,00 | ||
RABU | ||||
2024-11-20 | Infak jalan tgl 20-11-2024 | 385.000,00 | ||
2024-11-20 | Semen 20zak Tiga Roda (Bu Suliyah) Way sido | 1.160.000,00 | ||
2024-11-20 | Pasir 1 rit (Warga Dayaasri,Rk. 02, Rt. 04) | 1.100.000,00 | ||
2024-11-20 | Pasir 1 rit (Warga Dayaasri,Rk. 02, Rt. 01) | 1.100.000,00 | ||
2024-11-20 | Pasir 1 rit (Warga Dayaasri,Rk. 02, Rt. 08) | 1.100.000,00 | ||
2024-11-20 | Semen 20zak Tiga Roda (Bu Suliyah) Way sido | 1.160.000,00 | ||
2024-11-20 | Pasir 1 rit (Warga Dayaasri,Rk. 02, Rt. 04) | 1.100.000,00 | ||
2024-11-20 | Pasir 1 rit (Warga Dayaasri,Rk. 02, Rt. 01) | 1.100.000,00 | ||
2024-11-20 | Pasir 1 rit (Warga Dayaasri,Rk. 02, Rt. 08) | 1.100.000,00 | ||
2024-11-20 | Belanja material - 200btg besi 10mm MSI | 11.800.000,00 | ||
2024-11-20 | Belanja material - 50lbr Multiplek 15mm Pelem | 10.500.000,00 | ||
KAMIS | ||||
2024-11-21 | Infak jalan tgl 21-11-2024 | 870.000,00 | ||
2024-11-21 | Semen 38zak MP ( Pak Yanto, Daya asri) | 1.976.000,00 | ||
2024-11-21 | Semen 38zak MP ( Pak Yanto, Daya asri) | 1.976.000,00 | ||
2024-11-21 | Hamba Allah | 1.000.000,00 | ||
JUMAT | ||||
2024-11-22 | Infak jalan tgl 22-11-2024 | 2.110.000,00 | ||
2024-11-22 | Infak pasar dayamurni tgl 22-11-2024 | 1.000.000,00 | ||
2024-11-22 | Infak pasar mulya asri 22-11-2024 | 730.000,00 | ||
2024-11-22 | Bpk Nadir | 5.000.000,00 | ||
2024-11-22 | H. Jumar (margo mulyo) | 1.000.000,00 | ||
2024-11-22 | Pak Sriyono | 500.000,00 | ||
2024-11-22 | H. Karbiso | 300.000,00 | ||
2024-11-22 | Semen 10zak DX ( Asih/Dani) | 570.000,00 | ||
2024-11-22 | Semen 10zak DX ( Asih/Dani) | 570.000,00 | ||
SABTU | ||||
2024-11-23 | Infak jalan tgl 23-11-2024 | 580.000,00 | ||
2024-11-23 | Belanja material - 4btg PVC 4" Victory Premium AW - 2pcs Knie 4" Cross - 1pcs Nilon Roll tgg | 672.000,00 | ||
AHAD | ||||
2024-11-24 | Infak jalan tgl 24-11-2024 | 780.000,00 | ||
2024-11-24 | Infak pasar Pulung Kencana tgl 24-11-2024 | 800.000,00 | ||
2024-11-24 | Bpk Arinal Junaidi | 2.000.000,00 | ||
2024-11-24 | H. Ikhwan ( Toko "EMAS" MUJUR) rek BSI | 5.000.000,00 | ||
2024-11-24 | Biaya tenaga pekerja 7 hari kerja | 6.955.000,00 | ||
2024-11-24 | Belanja material - 4btg PVC 4" VICTORY PREMIUM AW - 1pcs Knie 4" Cross | 653.000,00 | ||
Total | 30.096.000,00 | 44.878.000,00 | - 14.782.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 24 November 2024 | - 14.782.000,00 | |||
SENIN | ||||
2024-11-25 | Infak jalan tgl 25-11-2024 | 490.000,00 | ||
2024-11-25 | Infak pasar dayamurni pagi tgl 25-11-2024 | 370.000,00 | ||
2024-11-25 | Bantuan Biro Kesra Provinsi Lampung (rek Bank Lampung) | 15.000.000,00 | ||
2024-11-25 | Biaya administrasi Bank Lampung | 150.000,00 | ||
SELASA | ||||
2024-11-26 | Infak jalan tgl 26-11-2024 | 440.000,00 | ||
2024-11-26 | Hadi margono (Candra Mukti) | 100.000,00 | ||
2024-11-26 | Belanja Material - 1roll selang benang 1" Biasa - 1ktk paku beton DAIWA 2" - 1pcs mata potong gerinda keramik HASTON - 1pcs benang nilon roll tgg | 545.000,00 | ||
2024-11-26 | Belanja material - 1pcs Pahat beton panjang | 30.000,00 | ||
2024-11-26 | Belanja material - 3pcs linggis besar | 180.000,00 | ||
2024-11-26 | Semen 10zak MP ( Pak Sunaryo , Margo Dadi) | 520.000,00 | ||
2024-11-26 | Semen 10zak MP ( Pak Sunaryo , Margo Dadi) | 520.000,00 | ||
RABU | ||||
2024-11-27 | Hamba Allah | 1.000.000,00 | ||
2024-11-27 | Beberapa Hamba Allah (rek Bank Lampung) | 500.000,00 | ||
KAMIS | ||||
2024-11-28 | Infak jalan tgl 28-11-2024 | 600.000,00 | ||
2024-11-28 | Biaya tutuh kayu | 100.000,00 | ||
JUMAT | ||||
2024-11-29 | Infak jalan tgl 29-11-2024 | 1.400.000,00 | ||
2024-11-29 | Infak pasar dayamurni tgl 29-11-2024 | 900.000,00 | ||
2024-11-29 | Infak pasar mulya asri tgl 29-11-2024 | 650.000,00 | ||
SABTU | ||||
2024-11-30 | Infak jalan tgl 30-11-2024 | 600.000,00 | ||
2024-11-30 | Semen 15zak DX (Hamba Allah) | 825.000,00 | ||
2024-11-30 | Semen 2zak DX ( Bu cicih herawati) | 110.000,00 | ||
2024-11-30 | Besi 16mm ulir SNI FULL 53 Btg ( Bpk Budiman Jaya, Kepala Dinas Pendidikan TBB) | 10.000.000,00 | ||
2024-11-30 | Besi 16mm ulir SNI FULL, 97btg ( H. Supardan) | 18.430.000,00 | ||
2024-11-30 | Pasir 1 rit ( Warga Daya asri Rk. 02, Rt. 03) | 1.100.000,00 | ||
2024-11-30 | Semen 10zak DX ( Hamba Allah) | 570.000,00 | ||
2024-11-30 | Semen 2zak Tiga roda ( Hamba Allah) | 116.000,00 | ||
2024-11-30 | Semen 15zak DX (Hamba Allah) | 825.000,00 | ||
2024-11-30 | Semen 2zak DX ( Bu cicih herawati) | 110.000,00 | ||
2024-11-30 | Besi 16mm ulir SNI FULL 53 Btg ( Bpk Budiman Jaya, Kepala Dinas Pendidikan TBB) | 10.000.000,00 | ||
2024-11-30 | Besi 16mm ulir SNI FULL, 97btg ( H. Supardan) | 18.430.000,00 | ||
2024-11-30 | Pasir 1 rit ( Warga Daya asri Rk. 02, Rt. 03) | 1.100.000,00 | ||
2024-11-30 | Semen 10zak DX ( Hamba Allah) | 570.000,00 | ||
2024-11-30 | Semen 2zak Tiga roda ( Hamba Allah) | 116.000,00 | ||
AHAD | ||||
2024-12-01 | Infak jalan tgl 1-12-2024 | 490.000,00 | ||
2024-12-01 | Infak pasar pulung tgl 1-12-2024 | 850.000,00 | ||
2024-12-01 | H. Mustofa | 1.000.000,00 | ||
2024-12-01 | Biaya tenaga pekerja 7 hari kerja | 6.090.000,00 | ||
Total | 41.279.000,00 | 38.766.000,00 | 2.513.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 1 Desember 2024 | 2.513.000,00 | |||
SENIN | ||||
2024-12-02 | Infak jalan tgl 2-12-2024 | 715.000,00 | ||
2024-12-02 | Infak pasar Dayamurni pagi tgl 2-12-2024 | 460.000,00 | ||
SELASA | ||||
2024-12-03 | Infak jalan tgl 3-12-2024 | 800.000,00 | ||
2024-12-03 | Hamba Allah (way kanan) | 1.000.000,00 | ||
2024-12-03 | Semen 30zak DX ( Pak Andika, way sido) | 1.650.000,00 | ||
2024-12-03 | Pasir 1 rit ( warga daya asri Rk. 02, Rt. 07) | 1.100.000,00 | ||
2024-12-03 | Semen 30zak DX ( Pak Andika, way sido) | 1.650.000,00 | ||
2024-12-03 | Pasir 1 rit ( warga daya asri Rk. 02, Rt. 07) | 1.100.000,00 | ||
RABU | ||||
2024-12-04 | Infak SPP warga Rk. 01, Rt. 01 | 855.000,00 | ||
2024-12-04 | Infak SPP warga Rk. 01, Rt. 03 | 1.462.000,00 | ||
2024-12-04 | Infak SPP warga Rk. 01, Rt. 04 | 2.056.500,00 | ||
2024-12-04 | Infak SPP warga Rk. 01, Rt. 05 | 643.500,00 | ||
2024-12-04 | Infak SPP warga Rk. 01, Rt. 06 | 1.080.000,00 | ||
2024-12-04 | Infak SPP warga Rk. 01, Rt. 08 | 2.570.000,00 | ||
2024-12-04 | Pasir 1 rit ( mbah Asmuni (alm)) | 1.100.000,00 | ||
2024-12-04 | Pasir 1 rit ( Bu siti Maryam (Toko Pupuk)) | 1.100.000,00 | ||
2024-12-04 | Pasir 1 rit ( mbah Asmuni (alm)) | 1.100.000,00 | ||
2024-12-04 | Pasir 1 rit ( Bu siti Maryam (Toko Pupuk)) | 1.100.000,00 | ||
2024-12-04 | Infak jalan tgl 4-12-2024 | 320.000,00 | ||
KAMIS | ||||
2024-12-05 | Infak jalan tgl 5-12-2024 | 615.000,00 | ||
2024-12-05 | H. Topari | 300.000,00 | ||
2024-12-05 | Belanja material - 2dus paku 2,5" & 4" | 600.000,00 | ||
2024-12-05 | Semen 10zak MP ( Hamba Allah) | 520.000,00 | ||
2024-12-05 | Pemindahan uang dari Kas Masjid ke Kas Pembangunan Masjid | 20.000.000,00 | ||
2024-12-05 | Semen 10zak MP ( Hamba Allah) | 520.000,00 | ||
JUMAT | ||||
2024-12-06 | Infak jalan tgl 6-12-2024 | 950.000,00 | ||
2024-12-06 | Infak pasar Dayamurni tgl 6-12-2024 | 760.000,00 | ||
2024-12-06 | Infak pasar mulya asri tgl 6-12-2024 | 700.000,00 | ||
2024-12-06 | Semen 10zak DX ( Warga Daya asri Rk. 02, Rt. 07) | 550.000,00 | ||
2024-12-06 | Semen 2zak MP ( mbah yoso) | 104.000,00 | ||
2024-12-06 | Semen 100zak MP ( Bpk Putra Jaya Umar) | 5.100.000,00 | ||
2024-12-06 | Pasir 1 rit ( warga daya asri Rk. 01, Rt. 02) | 1.100.000,00 | ||
2024-12-06 | Semen 10zak DX ( Warga Daya asri Rk. 02, Rt. 07) | 550.000,00 | ||
2024-12-06 | Semen 2zak MP ( mbah yoso) | 104.000,00 | ||
2024-12-06 | Semen 100zak MP ( Bpk Putra Jaya Umar) | 5.100.000,00 | ||
2024-12-06 | Pasir 1 rit ( warga daya asri Rk. 01, Rt. 02) | 1.100.000,00 | ||
2024-12-06 | Beli pasir 1 rit | 1.100.000,00 | ||
2024-12-06 | Belanja material - 5pcs palu fukung gagang kayu 0,5 | 150.000,00 | ||
2024-12-06 | Budi Utomo (rek BSI) | 1.250.000,00 | ||
SABTU | ||||
2024-12-07 | Infak jalan tgl 7-12-2024 | 460.000,00 | ||
2024-12-07 | Belanja material - 2dus paku 4" | 600.000,00 | ||
AHAD | ||||
2024-12-08 | Infak jalan tgl 8-12-2024 | 730.000,00 | ||
2024-12-08 | Infak pasar pulung kencana tgl 8-12-2024 | 860.000,00 | ||
2024-12-08 | Biaya tenaga pekerja 7 hari kerja + lembur | 7.460.000,00 | ||
Total | 53.424.000,00 | 22.234.000,00 | 31.190.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 8 Desember 2024 | 31.190.000,00 | |||
SENIN | ||||
2024-12-09 | Infak jalan tgl 9-12-2024 | 695.000,00 | ||
2024-12-09 | Infak pasar dayamurni pagi tgl 9-12-2024 | 435.000,00 | ||
2024-12-09 | Belanja material - 2dus paku 4" - 1ktk paku beton DAIWA 4" | 640.000,00 | ||
SELASA | ||||
2024-12-10 | Infak jalan tgl 10-12-2024 | 700.000,00 | ||
2024-12-10 | Belanja material - 4pcs ember cor orange - 5pcs bak cor bagus - 1btg pvc 2,5" biasa - 6pcs knie 2,5" biasa | 196.000,00 | ||
2024-12-10 | Pembayaran kayu usuk dari rumah/gudang pak mul | 2.500.000,00 | ||
2024-12-10 | Hamba allah | 800.000,00 | ||
RABU | ||||
2024-12-11 | Infak jalan tgl 11-12-2024 | 625.000,00 | ||
2024-12-11 | Belanja material - 2dus paku 4" | 600.000,00 | ||
2024-12-11 | Belanja material - 4pcs Elbow 2,5" biasa | 32.000,00 | ||
KAMIS | ||||
2024-12-12 | Infak jalan tgl 12-12-2024 | 640.000,00 | ||
2024-12-12 | Pak Samsi S.ag , MPDI (rek BSI) | 500.000,00 | ||
JUMAT | ||||
2024-12-13 | Infak jalan tgl 13-12-2024 | 640.000,00 | ||
2024-12-13 | Infak pasar mulya asri tgl 13-12-2024 | 550.000,00 | ||
2024-12-13 | Infak amplop pasar dayamurni tgl 13-12-2024 | 742.000,00 | ||
2024-12-13 | Semen 2 zak MP ( Pak Margono) | 104.000,00 | ||
2024-12-13 | Semen 10zak DX (Kurnia Wirajaya) | 550.000,00 | ||
2024-12-13 | Semen 2 zak MP ( Pak Margono) | 104.000,00 | ||
2024-12-13 | Belanja material - 3pcs Ruskram besi Fata - 3pcs Kuas 4" Biasa | 90.000,00 | ||
2024-12-13 | Semen 10zak DX (Kurnia Wirajaya) | 550.000,00 | ||
SABTU | ||||
2024-12-14 | Infak jalan tgl 14-12-2024 | 680.000,00 | ||
2024-12-14 | Beli kayu kaso racuk 2m&3m 12kubik+ongkir | 9.150.000,00 | ||
AHAD | ||||
2024-12-15 | Infak jalan tgl 15-12-2024 | 640.000,00 | ||
2024-12-15 | Infak pasar pulung kencana tgl 15-12-2024 | 800.000,00 | ||
2024-12-15 | Beli bata bolong 1800pcs | 1.125.000,00 | ||
2024-12-15 | Belanja material - 2dus paku 4" | 600.000,00 | ||
2024-12-15 | Biaya tenaga pekerja 7hari kerja | 6.830.000,00 | ||
Total | 40.291.000,00 | 22.417.000,00 | 17.874.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 15 Desember 2024 | 17.874.000,00 | |||
SENIN | ||||
2024-12-16 | Infak jalan tgl 16-12-2024 | 785.000,00 | ||
2024-12-16 | Infak pasar dayamurni pagi tgl 16-12-2024 | 480.000,00 | ||
2024-12-16 | Batu split 2rit 12kubik ( H. Ahmad ansor (alm)) | 4.600.000,00 | ||
2024-12-16 | Batu split 2rit 12kubik ( H. Ahmad ansor (alm)) | 4.600.000,00 | ||
2024-12-16 | Belanja material - 1btg PVC 1 1/4" Rucika AW | 70.000,00 | ||
SELASA | ||||
2024-12-17 | Infak jalan tgl 17-12-2024 | 750.000,00 | ||
2024-12-17 | Beli bata 1000pcs | 625.000,00 | ||
2024-12-17 | Belanja material - 2dus Paku 4" | 600.000,00 | ||
RABU | ||||
2024-12-18 | Infak jalan tgl 18-12-2024 | 770.000,00 | ||
2024-12-18 | Hj. Maryana Spdi & H. Tabrani ahmad (Bandar Lampung) | 1.000.000,00 | ||
2024-12-18 | Bp Sulistianto | 1.000.000,00 | ||
2024-12-18 | Beli umbul2 (pak marfuin) | 500.000,00 | ||
2024-12-18 | Beli kayu usuk racuk 2m&3m 8kubik + ongkos | 6.350.000,00 | ||
KAMIS | ||||
2024-12-19 | Belanja material - 1ktk paku beton DAIWA 2" - 1pcs Nilon Roll besar - 1pcs siku tukang penggaris biasa | 55.000,00 | ||
2024-12-19 | Infak jalan tgl 19-12-2024 | 530.000,00 | ||
2024-12-19 | Tukang antar kayu | 80.000,00 | ||
JUMAT | ||||
2024-12-20 | Infak jalan tgl 20-12-2024 | 899.000,00 | ||
2024-12-20 | Infak pasar dayamurni tgl 20-12-2024 | 800.000,00 | ||
2024-12-20 | Semen 2zak (Pak Margono) | 104.000,00 | ||
2024-12-20 | Semen 2zak (Pak Margono) | 104.000,00 | ||
2024-12-20 | Belanja material - 20ikat karet tali pipih | 400.000,00 | ||
SABTU | ||||
2024-12-21 | Infak jalan tgl 21-12-2024 | 420.000,00 | ||
2024-12-21 | Bpk Achmad Nazarudin S.IP, M.IP (Camat) | 500.000,00 | ||
2024-12-21 | H. Juwarto (rek BSI) | 10.000.000,00 | ||
2024-12-21 | Belanja material - 2dus paku 4" - 1pcs kikir Bahco | 635.000,00 | ||
AHAD | ||||
2024-12-22 | Infak jalan tgl 22-12-2024 | 470.000,00 | ||
2024-12-22 | H. Surandi & istiqomah (karta raharja) | 400.000,00 | ||
2024-12-22 | Biaya tenaga kerja 7 hari kerja | 5.850.000,00 | ||
2024-12-22 | Beli tali karet 13 ikat | 260.000,00 | ||
Total | 41.462.000,00 | 20.049.000,00 | 21.413.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 22 Desember 2024 | 21.413.000,00 | |||
SENIN | ||||
2024-12-23 | Infak jalan tgl 23-12-2024 | 600.000,00 | ||
2024-12-23 | Infak pasar dayamurni pagi tgl 23-12-2024 | 315.000,00 | ||
2024-12-23 | Infak pasar pulung kencana tgl 23-12-2024 | 715.000,00 | ||
2024-12-23 | Infak kotak toko-toko tgl 23-12-2024 | 7.255.000,00 | ||
2024-12-23 | Beli - 1pcs Travo las RHINO 160A (1.500.000) - 1pcs Tang Monyet TEKIRO 10"(125.000) | 1.625.000,00 | ||
SELASA | ||||
2024-12-24 | Infak jalan tgl 24-12-2024 | 440.000,00 | ||
2024-12-24 | Belanja material - 4ktk kawat las RB 2,6 5kg | 700.000,00 | ||
2024-12-24 | Belanja material - 2dus paku 4" | 600.000,00 | ||
RABU | ||||
2024-12-25 | Infak jalan tgl 25-12-2024 | 200.000,00 | ||
KAMIS | ||||
2024-12-26 | Belanja material - 20 ikat karet tali pipih | 400.000,00 | ||
2024-12-26 | Belanja material - 25pcs mata gerinda potong besi IWA - 1pcs saklar gerinda | 95.000,00 | ||
2024-12-26 | Biaya serkel kayu+konsumsi | 850.000,00 | ||
2024-12-26 | Infak jalan tgl 26-12-2024 | 780.000,00 | ||
2024-12-26 | M. Indra Saputra (rek BSI) | 1.500.000,00 | ||
JUMAT | ||||
2024-12-27 | Infak jalan tgl 27-12-2024 | 638.000,00 | ||
2024-12-27 | Infak pasar dayamurni tgl 27-12-2024 | 660.000,00 | ||
2024-12-27 | Infak pasar mulya asri tgl 27-12-2024 | 770.000,00 | ||
2024-12-27 | Hj. Suyati sudadi | 250.000,00 | ||
2024-12-27 | Pak Cecep Ramdani ( a/n Hj. Rokma Rahmalia Binti Abukori (alm)) (rek BSI) | 1.000.000,00 | ||
SABTU | ||||
2024-12-28 | Infak jalan tgl 28-12-2024 | 480.000,00 | ||
AHAD | ||||
2024-12-29 | Infak jalan tgl 29-12-2024 | 490.000,00 | ||
2024-12-29 | Infak pasar pulung kencana tgl 29-12-2024 | 880.000,00 | ||
2024-12-29 | Bu Isnaini (KA SMPN Kagungan Ratu) (a/n Arkham Sultan jaya bin Ahmad Sarpudin) | 500.000,00 | ||
2024-12-29 | Biaya pengiriman kayu randu 1,25 kubik | 150.000,00 | ||
2024-12-29 | Biaya tenaga pekerja 7 hari kerja | 6.275.000,00 | ||
Total | 38.886.000,00 | 10.695.000,00 | 28.191.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 29 Desember 2024 | 28.191.000,00 | |||
SENIN | ||||
2024-12-30 | Infak jalan tgl 30-12-2024 | 1.000.000,00 | ||
2024-12-30 | Belanja material - 2dus paku 4" - 1pcs siku tukang - 1dus kawat las RB 2,6 | 1.315.000,00 | ||
2024-12-30 | Belanja material - 1dus paku 3,5" | 300.000,00 | ||
2024-12-30 | Semen 20zak DX ( Hamba Allah) | 1.100.000,00 | ||
2024-12-30 | Semen 20zak DX ( Hamba Allah) | 1.100.000,00 | ||
SELASA | ||||
2024-12-31 | Infak jalan tgl 31-12-2024 | 600.000,00 | ||
2024-12-31 | Beli Bata 15000 pcs | 8.550.000,00 | ||
2024-12-31 | Belanja material - 100btg besi 16mm Ulir Full SNI LTS | 19.000.000,00 | ||
2024-12-31 | Pembuatan banner | 540.000,00 | ||
2024-12-31 | Biaya tenaga kerja Las besi (JOn) | 600.000,00 | ||
RABU | ||||
2025-01-01 | Infak jalan tgl 1-1-2025 | 330.000,00 | ||
2025-01-01 | Belanja material - 1dus paku 3,5" | 300.000,00 | ||
KAMIS | ||||
2025-01-02 | Infak jalan tgl 2-1-2025 | 520.000,00 | ||
2025-01-02 | Belanja material - 1roll kawat bendrat -+20kg | 320.000,00 | ||
2025-01-02 | Bpk Bustami Zainudin (rek Bank Lampung) | 500.000,00 | ||
2025-01-02 | Bpk Zainuri | 1.500.000,00 | ||
JUMAT | ||||
2025-01-03 | Infak jalan tgl 3-1-2025 | 920.000,00 | ||
2025-01-03 | Infak pasar Dayamurni tgl 3-1-2025 | 700.000,00 | ||
2025-01-03 | Infak pasar mulya asri tgl 3-1-2025 | 870.000,00 | ||
2025-01-03 | Bpk Eko (karta) | 500.000,00 | ||
2025-01-03 | Rendra Ibnu Guntoro (seputih Mataram, lamteng) rek BSI | 1.000.000,00 | ||
2025-01-03 | Siti Nurfaizah (seputih Mataram, lamteng) rek BSI | 500.000,00 | ||
2025-01-03 | Hamba Allah | 1.000.000,00 | ||
2025-01-03 | Bpk musarif | 100.000,00 | ||
2025-01-03 | Budi Utomo (rek BSI) | 1.500.000,00 | ||
2025-01-03 | Bayar jasa tukang las | 2.400.000,00 | ||
2025-01-03 | Beli 1ktk kawat las RB 2,6 5kg | 200.000,00 | ||
2025-01-03 | Beli - 6mtr kabel praba 2x1,5 - 1pcs stop L2 broco - 1pcs steker broco | 158.000,00 | ||
2025-01-03 | Jasa perbaikan sound mic masjid | 100.000,00 | ||
2025-01-03 | Belanja material - 4pcs Gegep IGM | 120.000,00 | ||
SABTU | ||||
2025-01-04 | Biaya tenaga kerja 5 hari kerja | 4.475.000,00 | ||
AHAD | ||||
2025-01-05 | Biaya tukang las (jon) | 600.000,00 | ||
Total | 40.831.000,00 | 40.078.000,00 | 753.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 5 Januari 2025 | 753.000,00 | |||
SENIN | ||||
2025-01-06 | Semen 25zak DX ( H. Sanusi, pulung kencana) | 1.375.000,00 | ||
2025-01-06 | Semen 25zak DX ( H. Sanusi, pulung kencana) | 1.375.000,00 | ||
Total | 2.128.000,00 | 1.375.000,00 | 753.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 6 Januari 2025 | 753.000,00 | |||
JUMAT | ||||
2025-01-17 | Infak jalan tgl 17-1-2025 | 1.940.000,00 | ||
2025-01-17 | Mas Yudi (ayam) | 1.000.000,00 | ||
2025-01-17 | Bpk Lugitono (alm) & bu sarjiem (alm) | 500.000,00 | ||
2025-01-17 | Biaya jasa potong besi | 3.080.000,00 | ||
2025-01-17 | Semen 110zak DX ( H. Mujianto & Hj. Sriyati) pulung kencana | 6.000.000,00 | ||
2025-01-17 | Semen 110zak DX ( H. Mujianto & Hj. Sriyati) pulung kencana | 6.000.000,00 | ||
SABTU | ||||
2025-01-18 | Infak jalan tgl 18-1-2025 | 960.000,00 | ||
2025-01-18 | Belanja material - 1roll kawat bendrat -+20kg | 300.000,00 | ||
AHAD | ||||
2025-01-19 | Infak jalan tgl 19-1-2025 | 690.000,00 | ||
2025-01-19 | Hamba Allah | 2.000.000,00 | ||
2025-01-19 | Hamba allah | 200.000,00 | ||
2025-01-19 | Hamba allah | 1.000.000,00 | ||
2025-01-19 | Infak SPP warga Daya asri Rk. 02 , Rt. 03 | 680.000,00 | ||
2025-01-19 | Infak SPP warga daya asri Rk. 02, Rt. 01 | 750.000,00 | ||
2025-01-19 | Biaya tenaga pekerja 3hari kerja | 1.410.000,00 | ||
2025-01-19 | Biaya jasa tebang bambu 800btg | 2.800.000,00 | ||
Total | 16.473.000,00 | 13.590.000,00 | 2.883.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 19 Januari 2025 | 2.883.000,00 | |||
SENIN | ||||
2025-01-20 | Infak jalan tgl 20-1-2025 | 720.000,00 | ||
SELASA | ||||
2025-01-21 | Infak jalan tgl 21-1-2025 | 940.000,00 | ||
2025-01-21 | Belanja material - 1roll kawat bendrat -+ 20kg | 300.000,00 | ||
RABU | ||||
2025-01-22 | Infak jalan tgl 22-1-2025 | 820.000,00 | ||
KAMIS | ||||
2025-01-23 | Infak jalan tgl 23-1-2025 | 620.000,00 | ||
2025-01-23 | Hamba Allah | 100.000,00 | ||
2025-01-23 | Bp Junaidi bin Salawi (alm) | 300.000,00 | ||
2025-01-23 | Belanja material - 2pcs kikir bahco - 1pcs wungkal gerinda pdk - 3kg paku reng bambu | 143.000,00 | ||
2025-01-23 | Jasa transportasi bambu | 500.000,00 | ||
JUMAT | ||||
2025-01-24 | Infak jalan tgl 24-1-2025 | 1.620.000,00 | ||
2025-01-24 | Semen 2zak DX (Bu entin wartini (alm) ) | 110.000,00 | ||
2025-01-24 | Semen 2zak DX (Bu entin wartini (alm) ) | 110.000,00 | ||
2025-01-24 | Belanja material - 50btg besi 10mm KSTY full SNI | 3.900.000,00 | ||
SABTU | ||||
2025-01-25 | Infak jalan tgl 25-1-2025 | 862.000,00 | ||
2025-01-25 | Belanja material - 5pcs pensil tukang | 10.000,00 | ||
AHAD | ||||
2025-01-26 | Infak jalan tgl 26-1-2025 | 650.000,00 | ||
2025-01-26 | Belanja material - 2pcs Nilon roll tanggung | 12.000,00 | ||
2025-01-26 | Biaya tenaga kerja 7hari kerja | 5.820.000,00 | ||
Total | 9.625.000,00 | 10.795.000,00 | - 1.170.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 26 Januari 2025 | - 1.170.000,00 | |||
SENIN | ||||
2025-01-27 | Infak jalan tgl 27-1-2025 | 955.000,00 | ||
2025-01-27 | Dr. Vina (icha) binti H. Yulisir | 1.000.000,00 | ||
2025-01-27 | Beli kayu kasau 3kubik & palet 3kubik | 4.500.000,00 | ||
2025-01-27 | Belanja material - 1roll kawat bendrat -+20kg - 25pcs mata gerinda IWA - 20btg besi 8mm SNI KSTY - alat listrik (kabel+saklar+colokan) | 1.574.000,00 | ||
SELASA | ||||
2025-01-28 | Infak jalan tgl 28-1-2025 | 670.000,00 | ||
2025-01-28 | Hamba Allah | 25.000,00 | ||
RABU | ||||
2025-01-29 | Infak jalan tgl 29-1-2025 | 890.000,00 | ||
2025-01-29 | Semen 20zak DX ( Mbah Ramio (alm) Bin Wiryo mpuh) | 1.100.000,00 | ||
2025-01-29 | Semen 20zak DX ( Mbah Ramio (alm) Bin Wiryo mpuh) | 1.100.000,00 | ||
2025-01-29 | Belanja material - 26pcs Tee 3" Rucika D - 1klg lem PVC isarplas - 1pcs Mesin Bor 13mm TOHO - 1pcs Mt. Bor Kayu 3/8 HKV | 1.345.000,00 | ||
KAMIS | ||||
2025-01-30 | Infak jalan tgl 30-1-2025 | 720.000,00 | ||
2025-01-30 | Gandung (daya sakti) | 500.000,00 | ||
2025-01-30 | Semen 20zak MP (Bu Budi Rahayu(girah) Bin H. Dzajuli) | 1.000.000,00 | ||
2025-01-30 | Semen 20zak MP (Bu Budi Rahayu(girah) Bin H. Dzajuli) | 1.000.000,00 | ||
2025-01-30 | Belanja material - 2dus paku 2,5" & 3,5" - 1roll kawat bendrat -+20kg - 50btg besi 10mm KSTY SNI full | 4.800.000,00 | ||
JUMAT | ||||
2025-01-31 | Infak jalan tgl 31-1-2025 | 1.540.000,00 | ||
2025-01-31 | Bp Yusuf jahrie (alm)bin cik jahrie dan ibu Siti Rokayah bin Hasan (alm) | 1.000.000,00 | ||
2025-01-31 | Belanja Material - 10btg PVC 1/2" Rugikan Aw - 1roll kabel praba 3x2,5 50m - 2roll kabel praba 2x1,5 50m | 3.950.000,00 | ||
2025-01-31 | Tanah urug 2rit ( pak matni) | 300.000,00 | ||
2025-01-31 | Tanah urug 2rit ( pak matni) | 300.000,00 | ||
SABTU | ||||
2025-02-01 | Infak jalan tgl 1-2-2025 | 880.000,00 | ||
AHAD | ||||
2025-02-02 | Infak jalan tgl 2-2-2025 | 730.000,00 | ||
2025-02-02 | Biaya tenaga pekerja 7hari kerja | 6.175.000,00 | ||
2025-02-02 | Tanah urug 2rit (H. Supardan) | 300.000,00 | ||
2025-02-02 | Semen 20zak DX ( a/n Fajar Ahmad Yurizal Bin Afrizal) | 1.100.000,00 | ||
2025-02-02 | Tanah urug 2rit (H. Supardan) | 300.000,00 | ||
2025-02-02 | Semen 20zak DX ( a/n Fajar Ahmad Yurizal Bin Afrizal) | 1.100.000,00 | ||
Total | 11.540.000,00 | 26.144.000,00 | - 14.604.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 2 Februari 2025 | - 14.604.000,00 | |||
SENIN | ||||
2025-02-03 | Infak jalan tgl 3-2-2025 | 770.000,00 | ||
2025-02-03 | Belanja - 1roll kawat bendrat - 2roll praba 2x1,5 50m - 3set ban luar+dalam Artis - 10pcs klaher artis - 2pcs As artis - 5pcs solusi - 50btg besi 10mm KSTY SNI - 2pcs stop L2 + steker Broco | 5.605.000,00 | ||
2025-02-03 | Semen 10zak DX (pak samsul Bahri) | 570.000,00 | ||
2025-02-03 | Semen 10zak DX (pak samsul Bahri) | 570.000,00 | ||
SELASA | ||||
2025-02-04 | Infak jalan tgl 4-2-2025 | 730.000,00 | ||
RABU | ||||
2025-02-05 | Infak jalan tgl 5-2-2025 | 900.000,00 | ||
2025-02-05 | Belanja material - 1roll kawat bendrat - 5kg paku 1 1/2" - 2roll praba 2x1,5 50m | 1.330.000,00 | ||
KAMIS | ||||
2025-02-06 | Infak jalan tgl 6-2-2025 | 665.000,00 | ||
2025-02-06 | Tanah urug 1 rit ( H. Supardan) | 150.000,00 | ||
2025-02-06 | Tanah urug 1 rit ( H. Supardan) | 150.000,00 | ||
JUMAT | ||||
2025-02-07 | Infak jalan tgl 7-2-2025 | 1.810.000,00 | ||
2025-02-07 | Nabila salma Qurrota aini ( a/n H. Kasdi (alm) & Hj. Sukini (alm) (rek BSI) | 750.000,00 | ||
SABTU | ||||
2025-02-08 | Infak jalan tgl 8-2-2025 | 930.000,00 | ||
2025-02-08 | Biaya pembuatan banner | 350.000,00 | ||
2025-02-08 | Belanja material - 50btg besi 10mm KSTY - 50btg besi 8mm SDS - 20pcs bak cor bgs - 130pcs ember cor bgs - 1pcs stop kran 1" KDJ - 1pcs Tee 1" R - 2ls sarung tangan biasa | 7.325.000,00 | ||
2025-02-08 | Semen 10zak DX (Bp Andika / Burmawi) | 550.000,00 | ||
2025-02-08 | Semen 10zak DX (Bp Andika / Burmawi) | 550.000,00 | ||
AHAD | ||||
2025-02-09 | Infak jalan tgl 9-2-2025 | 1.160.000,00 | ||
2025-02-09 | Konsumsi gotong royong 9-2-2025 | 1.000.000,00 | ||
2025-02-09 | Biaya tenaga kerja 7hari kerja | 6.250.000,00 | ||
Total | - 5.619.000,00 | 23.130.000,00 | - 28.749.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 9 Februari 2025 | - 28.749.000,00 | |||
SENIN | ||||
2025-02-10 | Infak jalan tgl 10-2-2025 | 525.000,00 | ||
SELASA | ||||
2025-02-11 | Infak jalan tgl 11-2-2025 | 930.000,00 | ||
2025-02-11 | Nota material - 1dus paku 3,5" - 1roll kawat bendrat -+20kg - 50btg besi 10mm KSTY - 5pcs pensil tukang | 4.510.000,00 | ||
RABU | ||||
2025-02-12 | Infak jalan tgl 12-2-2025 | 900.000,00 | ||
KAMIS | ||||
2025-02-13 | Infak jalan tgl 13-2-2025 | 1.440.000,00 | ||
2025-02-13 | Hj. Mujiati ( Bandar Lampung) rek BSI | 2.000.000,00 | ||
JUMAT | ||||
2025-02-14 | Infak jalan tgl 14-2-2025 | 2.216.000,00 | ||
2025-02-14 | Belanja material - 2btg PVC 3" Rucika AW - 1pcs Tee 3 Rucika D - 1roll kawat bendrat -+20kg - 1dus paku 4" - 1roll kabel praba 2x1,5 50m | 1.480.000,00 | ||
SABTU | ||||
2025-02-15 | Infak jalan tgl 15-2-2025 | 870.000,00 | ||
2025-02-15 | Semen 11zak DX ( Bpk. AKBP Hamid Andri Soemantri SIK. M.M (kapolres Tubaba)) | 605.000,00 | ||
2025-02-15 | Semen 11zak DX ( Bpk. AKBP Hamid Andri Soemantri SIK. M.M (kapolres Tubaba)) | 605.000,00 | ||
AHAD | ||||
2025-02-16 | Infak jalan tgl 16-2-2025 | 1.885.000,00 | ||
2025-02-16 | Biaya tenaga kerja 7hari kerja | 9.845.000,00 | ||
Total | - 17.378.000,00 | 16.440.000,00 | - 33.818.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 16 Februari 2025 | - 33.818.000,00 | |||
SENIN | ||||
2025-02-17 | Infak jalan tgl 17-2-2025 | 920.000,00 | ||
2025-02-17 | Hj. Mujiati (a/n H. Panding (alm)) | 14.150.000,00 | ||
2025-02-17 | H. Yulisir | 1.000.000,00 | ||
2025-02-17 | Infak pasar dayamurni subuh 17-2-2025 | 629.000,00 | ||
SELASA | ||||
2025-02-18 | Infak jalan tgl 18-2-2025 | 900.000,00 | ||
2025-02-18 | Belanja material - 3pcs linggis - 1ls Nilon roll tgg - 1dus paku 4" - 50btg besi 10mm SNI KSTY - 20btg besi 8mm SNI SDS - 1dus paku 2" - 2btg PVC 3" Rucika aw | 6.035.000,00 | ||
2025-02-18 | Kabel praba 4x4mm 2roll (H. Supardan) | 3.900.000,00 | ||
2025-02-18 | Kabel praba 4x4mm 2roll (H. Supardan) | 3.900.000,00 | ||
RABU | ||||
2025-02-19 | Infak jalan tgl 19-2-2025 | 915.000,00 | ||
KAMIS | ||||
2025-02-20 | Infak jalan tgl 20-2-2025 | 980.000,00 | ||
2025-02-20 | Semen 5zak DX ( Pak Azwar) | 275.000,00 | ||
2025-02-20 | Semen 5zak DX ( Pak Azwar) | 275.000,00 | ||
JUMAT | ||||
2025-02-21 | Infak jalan tgl 21-2-2025 | 1.525.000,00 | ||
2025-02-21 | Infak pasar dayamurni jumat tgl 21-2-2025 | 700.000,00 | ||
2025-02-21 | Pak Mujiono ( a/n Bu Uminah binti Amat Sardi (alm)) | 1.000.000,00 | ||
SABTU | ||||
2025-02-22 | Infak jalan tgl 22-2-2025 | 770.000,00 | ||
AHAD | ||||
2025-02-23 | Infak jalan tgl 23-2-2025 | 900.000,00 | ||
2025-02-23 | Infak SPP warga daya asri Rk. 02, Rk. 07 | 1.300.000,00 | ||
2025-02-23 | Infak SPP warga daya asri Rk. 02, Rk. 04 | 905.000,00 | ||
2025-02-23 | Infak SPP warga daya asri Rk. 02, Rk. 02 | 450.000,00 | ||
2025-02-23 | Infak SPP warga daya asri Rk. 02, Rk. 05 | 580.000,00 | ||
2025-02-23 | Infak SPP warga daya asri Rk. 02, Rk. 01 | 900.000,00 | ||
2025-02-23 | Biaya tenaga kerja 7hari kerja | 8.720.000,00 | ||
2025-02-23 | Belanja Material (21&23-02-2025) - 1dus paku 3,5" - 50btg besi 10mm KSTY SNI - 2roll kawat bendrat -+20kg - 5lbr triplek 15mm palem - 50btg besi 10mm KSTY SNI - 2roll kawat bendrat -+20kg | 10.400.000,00 | ||
Total | - 1.119.000,00 | 29.330.000,00 | - 30.449.000,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 23 Februari 2025 | - 30.449.000,00 | |||
SENIN | ||||
2025-02-24 | Infak jalan tgl 24-2-2025 | 1.260.000,00 | ||
SELASA | ||||
2025-02-25 | Infak jalan tgl 25-2-2025 | 3.260.000,00 | ||
2025-02-25 | Biaya cara buku gambar Masjid & fotocopy | 365.000,00 | ||
2025-02-25 | Semen 20zak TR ( Bp Markidin) | 1.200.000,00 | ||
2025-02-25 | Semen 20zak TR ( Bp Markidin) | 1.200.000,00 | ||
RABU | ||||
2025-02-26 | Infak jalan tgl 26-2-2025 | 850.000,00 | ||
2025-02-26 | Belanja material - 50btg besi 8mm SDS SNI - 2dus paku 3,5" & 4" - 60btg besi 16mm ulir SNI LTS | 13.900.000,00 | ||
2025-02-26 | Semen 10zak TR (Bu Misiyem, a/n Bp Iskak bin Saimun (alm)) | 600.000,00 | ||
2025-02-26 | Semen 10zak TR (Bu Misiyem, a/n Bp Iskak bin Saimun (alm)) | 600.000,00 | ||
KAMIS | ||||
2025-02-27 | Infak jalan tgl 27-2-2025 | 690.000,00 | ||
2025-02-27 | Beli kayu usuk 2m & 3m dan kayu palet (108ikat 2/10x2, 68ikat 5/5x3, 55ikat 5/5x2 ) +ongkos bongkar | 7.239.000,00 | ||
JUMAT | ||||
2025-02-28 | Infak jalan tgl 28-2-2025 | 1.640.000,00 | ||
2025-02-28 | Infak pasar dayamurni jumat tgl 28-2-2025 | 1.002.000,00 | ||
2025-02-28 | Infak pasar Dayamurni, senin 24-2-2025 | 350.000,00 | ||
2025-02-28 | Infak SPP warga Rk. 02, Rt. 02 | 1.062.000,00 | ||
2025-02-28 | Infak SPP warga Rk. 03, Rt. 01 | 531.000,00 | ||
2025-02-28 | Infak SPP warga Rk. 03, Rt. 03 | 595.000,00 | ||
2025-02-28 | Infak SPP warga Rk. 03, Rt. 05 | 477.000,00 | ||
2025-02-28 | Infak SPP warga Rk. 03, Rt. 06 | 1.192.500,00 | ||
2025-02-28 | Biaya tenaga pekerja 5hari kerja | 6.675.000,00 | ||
2025-02-28 | Semen 10zak MP (keluarga besar Rasul Taslon) Dayamurni | 530.000,00 | ||
2025-02-28 | Semen 10zak MP (keluarga besar Rasul Taslon) Dayamurni | 530.000,00 | ||
SABTU | ||||
2025-03-01 | Infak jalan tgl 1-3-2025 | 750.000,00 | ||
2025-03-01 | Beli papan 2kubik | 4.100.000,00 | ||
AHAD | ||||
2025-03-02 | Infak jalan tgl 2-3-2025 | 700.000,00 | ||
2025-03-02 | Batu belah 1 rit ( a/n Mbah Anisa amin (alm)binti Amin (alm)) | 1.850.000,00 | ||
2025-03-02 | Batu belah 1 rit ( a/n Mbah Anisa amin (alm)binti Amin (alm)) | 1.850.000,00 | ||
Total | - 11.909.500,00 | 36.459.000,00 | - 48.368.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 2 Maret 2025 | - 48.368.500,00 | |||
SENIN | ||||
2025-03-03 | Infak jalan tgl 3-3-2025 | 840.000,00 | ||
2025-03-03 | Infak pasar Dayamurni subuh 3-3-2025 | 500.000,00 | ||
SELASA | ||||
2025-03-04 | Infak jalan tgl 4-3-2025 | 980.000,00 | ||
RABU | ||||
2025-03-05 | Infak jalan tgl 5-3-2025 | 970.000,00 | ||
2025-03-05 | Infak SPP warga Rk. 02, Rt. 03 | 947.000,00 | ||
2025-03-05 | Infak SPP warga Rk. 02, Rt. 07 | 1.380.000,00 | ||
2025-03-05 | Belanja material - 2dus paku 2" - 100btg besi 10mm KSTY SNI - 2pcs kikir gergaji BAHCO | 8.470.000,00 | ||
2025-03-05 | Semen 20zak DX (H. Idris dan Bu Sumiyati jumali binti Sastro dimejo) | 1.100.000,00 | ||
2025-03-05 | Semen 20zak DX (H. Idris dan Bu Sumiyati jumali binti Sastro dimejo) | 1.100.000,00 | ||
KAMIS | ||||
2025-03-06 | Infak jalan tgl 6-3-2025 | 475.000,00 | ||
2025-03-06 | Pemindahan Dana dari Kas Masjid ke Kas Pembangunan | 50.000.000,00 | ||
2025-03-06 | Semen 5zak MP (pak Sunaryo) | 265.000,00 | ||
2025-03-06 | Semen 10zak MP ( Bu Nusi (alm)) | 530.000,00 | ||
2025-03-06 | Semen 5zak MP (pak Sunaryo) | 265.000,00 | ||
2025-03-06 | Semen 10zak MP ( Bu Nusi (alm)) | 530.000,00 | ||
2025-03-06 | Konsumsi+operasional Rapat 4-3-2025 | 150.000,00 | ||
JUMAT | ||||
2025-03-07 | Infak jalan tgl 7-3-2025 | 1.360.000,00 | ||
2025-03-07 | Infak pasar dayamurni jumat tgl 7-3-2025 | 900.000,00 | ||
SABTU | ||||
2025-03-08 | Infak jalan tgl 8-3-2025 | 1.050.000,00 | ||
AHAD | ||||
2025-03-09 | Infak jalan tgl 9-3-2025 | 765.000,00 | ||
2025-03-09 | Biaya tenaga pekerja 7hari kerja | 8.915.000,00 | ||
Total | 13.693.500,00 | 19.430.000,00 | - 5.736.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 9 Maret 2025 | - 5.736.500,00 | |||
SENIN | ||||
2025-03-10 | Infak jalan tgl 10-3-2025 | 500.000,00 | ||
2025-03-10 | Infak pasar dayamurni senin subuh tgl 10-3-2025 | 420.000,00 | ||
SELASA | ||||
2025-03-11 | Infak jalan tgl 11-3-2025 | 1.630.000,00 | ||
RABU | ||||
2025-03-12 | Infak jalan tgl 12-3-2025 | 650.000,00 | ||
KAMIS | ||||
2025-03-13 | Infak jalan tgl 13-3-2025 | 580.000,00 | ||
2025-03-13 | Belanja material - 6pcs pensil tukang - 100btg besi 10mm KSTY SNI - 1dus paku 4" - 50btg besi 16mm ulir LTS SNI - 50btg besi 10mm LTS SNI - 2roll kawat bendrat - 10btg PVC 3" Rucika Aw - 4pcs Tee 3" R D - 1klg lem PVC Isarplas | 23.550.000,00 | ||
2025-03-13 | Belanja material - 50btg besi 8mm SDS SNI | 2.200.000,00 | ||
JUMAT | ||||
2025-03-14 | Infak jalan tgl 14-3-2025 | 1.245.000,00 | ||
2025-03-14 | Infak pasar dayamurni jumat tgl 14-3-2025 | 769.000,00 | ||
2025-03-14 | Beli kayu papan 2kubik | 4.100.000,00 | ||
SABTU | ||||
2025-03-15 | Infak jalan tgl 15-3-2025 | 1.300.000,00 | ||
2025-03-15 | Semen 10zak MP ( Mas Tri polisi) | 500.000,00 | ||
2025-03-15 | Semen 10zak MP ( Mas Tri polisi) | 500.000,00 | ||
AHAD | ||||
2025-03-16 | Infak jalan tgl 16-3-2025 | 870.000,00 | ||
2025-03-16 | Dr. Sulistianto | 1.000.000,00 | ||
2025-03-16 | Hamba Allah | 200.000,00 | ||
2025-03-16 | Semen 5zak DX (pak candra) | 275.000,00 | ||
2025-03-16 | Semen 5zak DX (Mas Sandi) | 275.000,00 | ||
2025-03-16 | Semen 5zak DX (pak candra) | 275.000,00 | ||
2025-03-16 | Semen 5zak DX (Mas Sandi) | 275.000,00 | ||
2025-03-16 | Biaya tenaga pekerja 7hari kerja | 9.245.000,00 | ||
Total | 4.477.500,00 | 40.145.000,00 | - 35.667.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 16 Maret 2025 | - 35.667.500,00 | |||
SENIN | ||||
2025-03-17 | Infak jalan tgl 17-3-2025 | 1.000.000,00 | ||
2025-03-17 | Infak pasar dayamurni senin subuh 17-3-2025 | 400.000,00 | ||
2025-03-17 | Beli kayu palet 8,24 kubik | 5.768.000,00 | ||
SELASA | ||||
2025-03-18 | Infak jalan tgl 18-3-2025 | 1.160.000,00 | ||
2025-03-18 | Sewa Excavator | 1.100.000,00 | ||
2025-03-18 | Belanja material - 2roll kawat bendrat -+20kg - 2ikat karet tapi - 4dus paku 2", 3,5", 4" - 50btg besi 16mm ulir SNI - 50btg besi 8mm LTS SNI - 100btg besi 10mm KSTY SNI | 19.840.000,00 | ||
2025-03-18 | Semen 100zak MP ( keluar Pak Aminul wahyu) (a/n : Baharun Tanjung bin Bidin tanjung (alm), Siti Jabeda siregar binti Raja muda siregar (alm), Tiorom Rambe binti juhan Rambe (alm) | 5.000.000,00 | ||
2025-03-18 | Semen 100zak MP ( keluar Pak Aminul wahyu) (a/n : Baharun Tanjung bin Bidin tanjung (alm), Siti Jabeda siregar binti Raja muda siregar (alm), Tiorom Rambe binti juhan Rambe (alm) | 5.000.000,00 | ||
RABU | ||||
2025-03-19 | Infak SPP warga Rk. 02, Rt. 04 | 1.500.000,00 | ||
2025-03-19 | Infak SPP warga Rk. 02, Rt. 03 | 1.180.000,00 | ||
2025-03-19 | Infak jalan tgl 19-3-2025 | 756.000,00 | ||
KAMIS | ||||
2025-03-20 | Infak jalan tgl 20-3-2025 | 1.050.000,00 | ||
JUMAT | ||||
2025-03-21 | Infak jalan tgl 21-3-2025 | 1.300.000,00 | ||
2025-03-21 | Infak pasar dayamurni jumat tgl 21-3-2025 | 970.000,00 | ||
2025-03-21 | Infak pasar mulya asri tgl 21-3-2025 | 1.200.000,00 | ||
2025-03-21 | Pak jumino (BSI) | 5.000.000,00 | ||
2025-03-21 | Bu Dinna Miftakhul jannah (BSI) | 1.000.000,00 | ||
SABTU | ||||
2025-03-22 | Infak jalan tgl 22-3-2025 | 800.000,00 | ||
2025-03-22 | Infak pasar karta raharja tgl 22-3-2025 | 575.000,00 | ||
2025-03-22 | Romlan bin burhani dan Ruslan bin Ronilan (Bangun Sari) | 1.000.000,00 | ||
2025-03-22 | Semen 5zak Tiga Roda (Hamba Allah (Candra kencana) ) | 290.000,00 | ||
2025-03-22 | Semen 5zak Tiga Roda (Hamba Allah (Candra kencana) ) | 290.000,00 | ||
AHAD | ||||
2025-03-23 | Infak jalan tgl 23-3-2025 | 670.000,00 | ||
2025-03-23 | Infak pasar pulung kencana tgl 23-3-2025 | 1.335.000,00 | ||
2025-03-23 | Biaya tenaga kerja 7hari kerja | 9.215.000,00 | ||
Total | - 9.481.500,00 | 41.213.000,00 | - 50.694.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 23 Maret 2025 | - 50.694.500,00 | |||
SENIN | ||||
2025-03-24 | Infak jalan tgl 24-3-2025 | 1.170.000,00 | ||
2025-03-24 | Infak pasar dayamurni senin subuh 24-3-2025 | 500.000,00 | ||
SELASA | ||||
2025-03-25 | Infak jalan tgl 25-3-2025 | 1.400.000,00 | ||
RABU | ||||
2025-03-26 | Infak jalan tgl 26-3-2025 | 800.000,00 | ||
2025-03-26 | Mas Eko (supir) & bu Sukamti (BSI) | 200.000,00 | ||
KAMIS | ||||
2025-03-27 | Infak jalan tgl 27-3-2025 | 770.000,00 | ||
2025-03-27 | Jamaah Tarawih Mushola At-Taqwa, Daya Asri Rk. 01, Rt. 05 | 5.500.000,00 | ||
2025-03-27 | Kelas Ekonomi syariah semester VI | 400.000,00 | ||
2025-03-27 | Aparatur Staf dan RT se Daya Asri | 3.000.000,00 | ||
2025-03-27 | Pendamping tekhnik Bangunan | 2.000.000,00 | ||
2025-03-27 | Biaya instalasi listrik | 2.000.000,00 | ||
2025-03-27 | Belanja material - 1ktk paku beton 2" IGM - 100btg besi 10mm KSTY SNI - 3roll kabel praba 2x1,5 50m - 25btg besi 10mm KSTY SNI | 11.185.000,00 | ||
2025-03-27 | Pemindahan Dana dari Kas Masjid ke Kas pembangunan masjid | 45.000.000,00 | ||
JUMAT | ||||
2025-03-28 | Infak jalan tgl 28-3-2025 | 1.970.000,00 | ||
2025-03-28 | Infak pasar Dayamurni jumat 28-3-2025 | 1.166.000,00 | ||
2025-03-28 | Infak pasar Mulya Asri 28-3-2025 | 1.115.000,00 | ||
2025-03-28 | Komunitas sepeda federal Tubaba | 500.000,00 | ||
2025-03-28 | Bu Rusmiyati (BSI) | 500.000,00 | ||
2025-03-28 | Pak Sarno (BSI) | 1.000.000,00 | ||
2025-03-28 | Bu Muslimah (alm) binti Maful | 500.000,00 | ||
2025-03-28 | Hj. Siti khafifah (alm) Binti kholik | 500.000,00 | ||
2025-03-28 | Rudy Nurul Salim (BSI) | 2.500.000,00 | ||
2025-03-28 | Ahmad Bukhori (BSI) | 2.000.000,00 | ||
2025-03-28 | Biaya tenaga pekerja 5hari kerja | 5.785.000,00 | ||
2025-03-28 | Semen 20zak MP ( a/n Pak Sunaryo, Bu jamilah (alm), pak sormon (alm), Bu Nusi (alm) | 1.060.000,00 | ||
2025-03-28 | Semen 7zak Tiga roda ( Bu Fatimah) | 420.000,00 | ||
2025-03-28 | Semen 20zak MP ( a/n Pak Sunaryo, Bu jamilah (alm), pak sormon (alm), Bu Nusi (alm) | 1.060.000,00 | ||
2025-03-28 | Semen 7zak Tiga roda ( Bu Fatimah) | 420.000,00 | ||
SABTU | ||||
2025-03-29 | Infak jalan tgl 29-3-2025 | 1.900.000,00 | ||
2025-03-29 | Pak Sis (Metro) | 2.500.000,00 | ||
2025-03-29 | Pak Jaswi (alm) dan Bu Sri herawati (alm) | 500.000,00 | ||
2025-03-29 | Mas Ari gunawan | 500.000,00 | ||
2025-03-29 | Toko-Toko Daya Asri Rk. 01 | 710.000,00 | ||
2025-03-29 | Biaya sablon kaos masjid | 600.000,00 | ||
2025-03-29 | Biaya cetak banner | 200.000,00 | ||
2025-03-29 | Pasir 1 rit ( Hadi Sukatno (alm) bin Joyo Samuri (alm) | 1.100.000,00 | ||
2025-03-29 | Semen 100zak Tiga roda ( Bu Ngatiem (alm) binti Wono dikromo (alm) (keluarga Bakso Punokawan) | 5.900.000,00 | ||
2025-03-29 | Pasir 1 rit ( Hadi Sukatno (alm) bin Joyo Samuri (alm) | 1.100.000,00 | ||
2025-03-29 | Semen 100zak Tiga roda ( Bu Ngatiem (alm) binti Wono dikromo (alm) (keluarga Bakso Punokawan) | 5.900.000,00 | ||
AHAD | ||||
2025-03-30 | Infak jalan tgl 30-3-2025 | 765.000,00 | ||
2025-03-30 | H. San Rohadi (alm) (BSI) | 2.000.000,00 | ||
2025-03-30 | Hamba Allah (BSI) | 400.000,00 | ||
2025-03-30 | Keluarga H. Ahmad Ansor (alm) | 5.000.000,00 | ||
2025-03-30 | Semen 20zak MP ( H. Suwarno suwito (alm)) | 1.040.000,00 | ||
2025-03-30 | Kaos Panitia ( RHAMA CLOTH) | 0,00 | ||
2025-03-30 | Semen 20zak MP ( H. Suwarno suwito (alm)) | 1.040.000,00 | ||
2025-03-30 | Kaos Panitia ( RHAMA CLOTH) | 0,00 | ||
Total | 43.591.500,00 | 31.290.000,00 | 12.301.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 30 Maret 2025 | 12.301.500,00 | |||
AHAD | ||||
2025-04-06 | Infak jalan tgl 6-4-2025 | 365.000,00 | ||
2025-04-06 | Hamba Allah | 3.000.000,00 | ||
2025-04-06 | Semen 100zak MP ( H. Gimun) | 5.000.000,00 | ||
2025-04-06 | Semen 10zak DX ( Mas Budi mebel) | 550.000,00 | ||
2025-04-06 | Semen 100zak MP ( H. Gimun) | 5.000.000,00 | ||
2025-04-06 | Semen 10zak DX ( Mas Budi mebel) | 550.000,00 | ||
Total | 21.216.500,00 | 5.550.000,00 | 15.666.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 6 April 2025 | 15.666.500,00 | |||
SENIN | ||||
2025-04-07 | Infak jalan tgl 7-4-2025 | 2.150.000,00 | ||
2025-04-07 | Pak Bimo bagus nugroho (BSI) | 300.000,00 | ||
SELASA | ||||
2025-04-08 | Infak jalan tgl 8-4-2025 | 1.230.000,00 | ||
2025-04-08 | Pak Saryo "GANAS" (rek BSI) | 850.000,00 | ||
2025-04-08 | Pak Wira Kumar sodikin "GANAS" (rek BSI) | 300.000,00 | ||
2025-04-08 | Pak Fredi "GANAS" (rek BSI) | 500.000,00 | ||
2025-04-08 | Pak Sevi "GANAS" (rek BSI) (ATM mini Vita R) | 100.000,00 | ||
RABU | ||||
2025-04-09 | Infak jalan tgl 9-4-2025 | 1.600.000,00 | ||
2025-04-09 | Mas Pur Bengkel "GANAS" | 100.000,00 | ||
KAMIS | ||||
2025-04-10 | Infak jalan tgl 10-4-2025 | 800.000,00 | ||
2025-04-10 | Beli kayu papan | 700.000,00 | ||
2025-04-10 | Belanja material - 20btg besi 16mm ulir SNI - 6ikat tali karet - 30btg besi 8mm LTS SNI | 4.640.000,00 | ||
2025-04-10 | Semen 50zak MP ( Bu Kemala dewi (alm) ) daya sakti | 2.500.000,00 | ||
2025-04-10 | Semen 100zak DX ( Hamba Allah) | 5.500.000,00 | ||
2025-04-10 | Semen 400zak DX ( Hamba Allah) | 22.000.000,00 | ||
2025-04-10 | Semen 50zak MP ( Bu Kemala dewi (alm) ) daya sakti | 2.500.000,00 | ||
2025-04-10 | Semen 100zak DX ( Hamba Allah) | 5.500.000,00 | ||
2025-04-10 | Semen 400zak DX ( Hamba Allah) | 22.000.000,00 | ||
JUMAT | ||||
2025-04-11 | Infak jalan tgl 11-4-2025 | 1.570.000,00 | ||
2025-04-11 | Pak karyanto (rek BSI) | 2.750.000,00 | ||
2025-04-11 | Pak Adi Candra (polisi) (rek BSI) | 500.000,00 | ||
2025-04-11 | Semen 30zak DX ( Hamba Allah) daya asri | 1.650.000,00 | ||
2025-04-11 | Semen 12zak DX ( Hamba Allah) | 660.000,00 | ||
2025-04-11 | Semen 10zak DX ( Vista Mandiri Cell) | 550.000,00 | ||
2025-04-11 | Semen 30zak DX ( Hamba Allah) daya asri | 1.650.000,00 | ||
2025-04-11 | Semen 12zak DX ( Hamba Allah) | 660.000,00 | ||
2025-04-11 | Semen 10zak DX ( Vista Mandiri Cell) | 550.000,00 | ||
SABTU | ||||
2025-04-12 | Infak jalan tgl 12-4-2025 | 920.000,00 | ||
2025-04-12 | Pak Leo Irawan (rek BSI) | 10.000.000,00 | ||
2025-04-12 | Mas Eko Budiman (supir) (rek BSI) | 150.000,00 | ||
2025-04-12 | Semen 50zak Tiga roda (Bu Mursih (alm) binti Warso pawiro (alm) (keluarga pak basuki) | 2.950.000,00 | ||
2025-04-12 | Pasir 1 rit (Hamba Allah) | 1.100.000,00 | ||
2025-04-12 | Semen 50zak Tiga roda (Bu Mursih (alm) binti Warso pawiro (alm) (keluarga pak basuki) | 2.950.000,00 | ||
2025-04-12 | Pasir 1 rit (Hamba Allah) | 1.100.000,00 | ||
AHAD | ||||
2025-04-13 | Infak jalan tgl 13-4-2025 | 1.570.000,00 | ||
2025-04-13 | Pak jaelani (alm) bin kromoyono (alm) dan Bu Rumini (alm) binti Tir saleh (alm) | 200.000,00 | ||
2025-04-13 | Dr. Sulistiyanto | 1.000.000,00 | ||
2025-04-13 | Pak Sudadi | 1.000.000,00 | ||
2025-04-13 | Biaya tenaga kerja 7hari kerja | 6.650.000,00 | ||
2025-04-13 | Semen 10zak DX ( pak budi metro elextrik) Pulung kencana | 550.000,00 | ||
2025-04-13 | Semen 10zak DX (Imam dayamurni) | 550.000,00 | ||
2025-04-13 | Semen 10zak DX ( pak budi metro elextrik) Pulung kencana | 550.000,00 | ||
2025-04-13 | Semen 10zak DX (Imam dayamurni) | 550.000,00 | ||
Total | 81.266.500,00 | 50.000.000,00 | 31.266.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 13 April 2025 | 31.266.500,00 | |||
SENIN | ||||
2025-04-14 | Infak jalan tgl 14-4-2025 | 940.000,00 | ||
2025-04-14 | H. Sucipto (alm) Bin Selo Prasojo (alm) dan Hj. Supiati (alm) binti Dharmo sentono (alm) | 1.000.000,00 | ||
SELASA | ||||
2025-04-15 | Infak jalan tgl 15-4-2025 | 800.000,00 | ||
RABU | ||||
2025-04-16 | Infak jalan tgl 16-4-2025 | 980.000,00 | ||
KAMIS | ||||
2025-04-17 | Infak jalan tgl 17-4-2025 | 1.855.000,00 | ||
2025-04-17 | Pasir 1 rit ( Ginda Conter) | 1.100.000,00 | ||
2025-04-17 | Pasir 1 rit ( Ginda Conter) | 1.100.000,00 | ||
2025-04-17 | Sewa alat cor | 2.000.000,00 | ||
2025-04-17 | Belanja material (11-13 april 2025) - 3pcs ban dalam swallow - 0,8kg tambang - 2ls sarung tangan - 1pcs otomatis tower - 20pcs bak cor bagus - 4mtr talang tambak - 15btg besi 10mm SNI KSTY - 12kg plastik PE biru | 2.030.000,00 | ||
JUMAT | ||||
2025-04-18 | Infak jalan tgl 18-4-2025 | 1.350.000,00 | ||
2025-04-18 | Infak pasar dayamurni tgl 18-4-2025 | 826.000,00 | ||
2025-04-18 | Hamba Allah | 500.000,00 | ||
SABTU | ||||
2025-04-19 | Infak jalan tgl 19-4-2025 | 930.000,00 | ||
AHAD | ||||
2025-04-20 | Infak jalan tgl 20-4-2025 | 800.000,00 | ||
Total | 42.347.500,00 | 5.130.000,00 | 37.217.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 20 April 2025 | 37.217.500,00 | |||
SENIN | ||||
2025-04-21 | Infak jalan tgl 21-4-2025 | 780.000,00 | ||
2025-04-21 | Batu split 1rit ( H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
2025-04-21 | Batu split 1rit ( H. Ahmad Ansor (alm)) | 2.300.000,00 | ||
SELASA | ||||
2025-04-22 | Infak jalan tgl 22-4-2025 | 850.000,00 | ||
RABU | ||||
2025-04-23 | Infak jalan tgl 23-4-2025 | 1.020.000,00 | ||
2025-04-23 | Pak Nasrudin (alm) bin saeran dan Bu sukati binti Dullah sukri (Margo Dadi) | 2.000.000,00 | ||
2025-04-23 | Pak Markimin (alm) bin asmungi dan Bu Rohimah binti Nasrudin (Margo Dadi) | 3.000.000,00 | ||
KAMIS | ||||
2025-04-24 | Infak jalan tgl 24-4-2025 | 1.850.000,00 | ||
2025-04-24 | Pak Agung Sugiarto bin Suwarno (Daya Asri Rk.04) | 300.000,00 | ||
2025-04-24 | Pak Katimin (Daya Asri) | 300.000,00 | ||
2025-04-24 | Infak SPP warga daya asri Rk.01 , Rt. 07 | 535.000,00 | ||
2025-04-24 | Belanja material - 36 btg besi 16mm ulir SNI IBD - 50 btg besi 8mm SNI WBL - 1 dus paku 4" - 1 ktk paku DAIWA 2" - 1 ikat Tali karet - 25 pcs Mata potong besi IWA | 9.290.000,00 | ||
JUMAT | ||||
2025-04-25 | Infak jalan tgl 25-4-2025 | 1.850.000,00 | ||
2025-04-25 | Infak pasar Dayamurni jumat tgl 25-4-2025 | 940.000,00 | ||
SABTU | ||||
2025-04-26 | Infak jalan tgl 26-4-2025 | 700.000,00 | ||
AHAD | ||||
2025-04-27 | Infak jalan tgl 27-4-2025 | 1.075.000,00 | ||
2025-04-27 | Biaya tenaga pekerja 7 hari kerja | 8.145.000,00 | ||
Total | 54.717.500,00 | 19.735.000,00 | 34.982.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 27 April 2025 | 34.982.500,00 | |||
SENIN | ||||
2025-04-28 | Infak jalan tgl 28-4-2025 | 500.000,00 | ||
SELASA | ||||
2025-04-29 | Infak jalan tgl 29-4-2025 | 800.000,00 | ||
RABU | ||||
2025-04-30 | Infak jalan tgl 30-4-2025 | 565.000,00 | ||
2025-04-30 | Hamba Allah | 590.000,00 | ||
KAMIS | ||||
2025-05-01 | Infak jalan tgl 1-5-2025 | 820.000,00 | ||
2025-05-01 | Belanja Material - 50 btg Besi 10mm SNI KSTY - 1 roll kawat bendrat -+20kg - 50 btg Besi 10mm SNI KSTY - 2 Dus Paku 2" & 2,5" - 1 roll kawat Bendrat | 9.000.000,00 | ||
2025-05-01 | Arif iqbal | 500.000,00 | ||
JUMAT | ||||
2025-05-02 | Infak jalan tgl 2-5-2025 | 1.650.000,00 | ||
2025-05-02 | Infak pasar dayamurni tgl 2-5-2025 | 986.000,00 | ||
2025-05-02 | Sewa scafolding 10set (1bulan) | 800.000,00 | ||
SABTU | ||||
2025-05-03 | Infak jalan tgl 3-5-2025 | 680.000,00 | ||
AHAD | ||||
2025-05-04 | Infak jalan tgl 4-5-2025 | 700.000,00 | ||
2025-05-04 | H. Supardan | 1.500.000,00 | ||
2025-05-04 | Pak maher (alm) | 1.500.000,00 | ||
2025-05-04 | Biaya tenaga pekerja 7 hari kerja | 7.735.000,00 | ||
Total | 45.773.500,00 | 17.535.000,00 | 28.238.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 4 Mei 2025 | 28.238.500,00 | |||
SENIN | ||||
2025-05-05 | Infak jalan tgl 5-5-2025 | 1.820.000,00 | ||
2025-05-05 | Infak pasar dayamurni subuh tgl 5-5-2025 | 440.000,00 | ||
SELASA | ||||
2025-05-06 | Infak jalan tgl 6-5-2025 | 740.000,00 | ||
2025-05-06 | Pak sukartam | 2.000.000,00 | ||
2025-05-06 | Beli kayu papan 2kubik | 4.100.000,00 | ||
RABU | ||||
2025-05-07 | Infak jalan tgl 7-5-2025 | 445.000,00 | ||
KAMIS | ||||
2025-05-08 | Infak jalan tgl 8-5-2025 | 550.000,00 | ||
2025-05-08 | Belanja material tgl 4 s/d 6-5-2025 - 2pcs gembok putih 50mm pdk - 2pcs linggis besar - 2pcs gagang gergaji kayu - 20mtr tali timba - 10btg PVC 2" Rucika AW - 10pcs Elbow 2" R D - 2pcs Meteran 5m Haston - 2ktk paku DAIWA 2" - 2ktk paku DAIWA 4" | 1.530.000,00 | ||
2025-05-08 | Belanja Material 8-5-2025 - 20btg besi 16mm ulir full WBL - 10btg PVC 2" R AW - 10pcs Elbow 2" R D - 1Roll kawat bendrat - 2pcs kikir - 3pcs pensil - 1pcs Obeng - 1pcs Solasi National - 1pcs Stop L3 Broco - 1pcs steker Broco - 1pcs Mt.Bor 10mm | 5.246.000,00 | ||
JUMAT | ||||
2025-05-09 | Infak jalan tgl 9-5-2025 | 1.560.000,00 | ||
2025-05-09 | Infak pasar dayamurni jumat tgl 9-5-2025 | 874.000,00 | ||
2025-05-09 | Infak SPP warga daya asri Rk.02, Rt.03 | 1.114.000,00 | ||
2025-05-09 | Infak SPP warga daya asri Rk.02, Rt.07 | 1.855.000,00 | ||
2025-05-09 | Infak SPP warga daya asri Rk.02, Rt.02 | 515.000,00 | ||
2025-05-09 | Infak SPP warga daya asri Rk.02, Rt.05 | 810.000,00 | ||
2025-05-09 | Infak SPP warga daya asri Rk.02, Rt.01 | 1.900.000,00 | ||
2025-05-09 | 1 rit pasir (Endi mebel, Daya asri) | 1.100.000,00 | ||
2025-05-09 | 1rit Pasir (Endi mebel, Daya asri) | 1.100.000,00 | ||
SABTU | ||||
2025-05-10 | Infak jalan tgl 10-5-2025 | 800.000,00 | ||
2025-05-10 | 2rit Batu split (H. Ahmad Ansor (alm) | 4.600.000,00 | ||
2025-05-10 | 2rit Batu split (H. Ahmad Ansor (alm) | 4.600.000,00 | ||
AHAD | ||||
2025-05-11 | Infak jalan tgl 11-5-2025 | 2.080.000,00 | ||
2025-05-11 | Biaya tenaga pekerja 7 hari kerja | 8.300.000,00 | ||
2025-05-11 | Pasir 1 rit (Endi mebel, Daya Asri) | 1.100.000,00 | ||
2025-05-11 | Pasir 1 rit (Endi mebel, Daya Asri) | 1.100.000,00 | ||
Total | 52.541.500,00 | 25.976.000,00 | 26.565.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 11 Mei 2025 | 26.565.500,00 | |||
SENIN | ||||
2025-05-12 | Infak jalan tgl 12-5-2025 | 970.000,00 | ||
2025-05-12 | Pak Riadi Daya asri Rk.2, Rt.1 | 1.000.000,00 | ||
SELASA | ||||
2025-05-13 | Infak jalan tgl 13-5-2025 | 1.010.000,00 | ||
2025-05-13 | Mbah Arjo Lakir (alm) dan Mbah Wagiyem (alm) | 1.000.000,00 | ||
2025-05-13 | Pak Hadi prayitno bun Darmo utomo (alm) dan Bu Paikem binti Darmo jamin (alm) | 500.000,00 | ||
2025-05-13 | Beli kayu papan 2kubik | 4.200.000,00 | ||
RABU | ||||
2025-05-14 | Infak jalan tgl 14-5-2025 | 1.030.000,00 | ||
2025-05-14 | 10zak semen DX ( Bp Junaidi (alm) | 550.000,00 | ||
2025-05-14 | 10zak semen DX ( Bp Junaidi (alm) | 550.000,00 | ||
KAMIS | ||||
2025-05-15 | Infak jalan tgl 15-5-2025 | 860.000,00 | ||
2025-05-15 | Beli pasir 2rit | 2.200.000,00 | ||
2025-05-15 | Belanja material 11 s/d 15-5-2025 - 30btg besi 16mm ulir full wbl - 1ls sarung tangan kain - 1ls sarung tangan karet fawi - 2roll kawat bendrat -+20kg - 2btg PVC 3" R AW - 5ktk Paku Daiwa 2" - 1,45 kg tambang - 50btg besi 8mm TJS | 8.880.000,00 | ||
JUMAT | ||||
2025-05-16 | Infak jalan tgl 16-5-2025 | 1.270.000,00 | ||
2025-05-16 | Infak pasar dayamurni jumat tgl 16-5-2025 | 992.000,00 | ||
SABTU | ||||
2025-05-17 | Infak jalan tgl 17-5-2025 | 1.340.000,00 | ||
2025-05-17 | Pasir 1 rit ( Hamba Allah) | 1.100.000,00 | ||
2025-05-17 | Pasir 1 rit ( Hamba Allah) | 1.100.000,00 | ||
AHAD | ||||
2025-05-18 | Infak jalan tgl 18-5-2025 | 745.000,00 | ||
2025-05-18 | Biaya tenaga pekerja 7hari kerja | 8.450.000,00 | ||
Total | 38.932.500,00 | 25.380.000,00 | 13.552.500,00 |
Tanggal | Transaksi | Pemasukan | Pengeluaran | Saldo |
---|---|---|---|---|
Saldo per 18 Mei 2025 | 13.552.500,00 | |||
SENIN | ||||
2025-05-19 | Infak jalan tgl 19-5-2025 | 970.000,00 | ||
2025-05-19 | Infak pasar dayamurni senin subuh tgl 19-5-2025 | 470.000,00 | ||
SELASA | ||||
2025-05-20 | Infak jalan tgl 20-5-2025 | 680.000,00 | ||
RABU | ||||
2025-05-21 | Infak jalan tgl 21-5-2025 | 560.000,00 | ||
2025-05-21 | Beli kayu palet 5kubik + ongkos | 3.600.000,00 | ||
KAMIS | ||||
2025-05-22 | Infak jalan tgl 22-5-2025 | 710.000,00 | ||
2025-05-22 | a/n Bu Jami (alm) dan Pak Temin (alm) | 200.000,00 | ||
2025-05-22 | Yesi dan Hudi | 200.000,00 | ||
2025-05-22 | Belanja Material - | 24.400.000,00 | ||
Total | 17.342.500,00 | 28.000.000,00 | - 10.657.500,00 |